Changed traffic conditions along the Hume Motorway between Narellan Road and Menangle Road Overpass Bridge.

Published

Road users are advised of changed traffic conditions from Sunday 5 May to Sunday 2 June along the Hume Motorway between Narellan Road and Menangle Road overpass bridge, excluding public holidays.

Work will involve asphalting and line-marking on the Hume Motorway for the upcoming project completion. Work will be undertaken over 20-night shifts, weather permitting:

Work hours are between:

  • 7pm to 5am, Wednesday to Sunday
  • 5am to 7pm, Saturday and Sunday

Over size over mass (OSOM) vehicles that are beyond 3.8 metres wide will be directed to temporarily park in a dedicated space on the Hume Motorway until they’re assisted by traffic controllers back onto the motorway to safely continue their journey. During night work, OSOM vehicles will need to wait and will be guided by traffic control to use the Dustbowl as a layover area.

A 4.5-kilometre contraflow will be in place to enable the closure of one carriageway each night with traffic control managing traffic in both directions and a reduced speed limit of 40 km/h in place for the safety of workers and road users. Two lanes will be maintained along the Hume Motorway during the day with a reduced speed limit of 40km/h in both directions.

Please allow for additional travel time during these hours as motorists may need to stop on the Hume Motorway for up to five minutes.

Motorists are advised to drive to the conditions and to follow the directions of signs and traffic control.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.