The Horsley Drive/Polding Street, Fairfield night work

Published

There will be changed traffic conditions along The Horsley Drive and Polding Street, Fairfield through to Thursday 6 June so that Transport for NSW can conduct investigation works.

This will include a 400 metre contra flow in operation along The Horsley Drive, Fairfield through to Thursday 6 June,between 6pm and 5am, weather permitting.

The investigation work will consist of potholing and minor excavations, utility investigations and trenching.

A reduced speed of 40km/h will be in place for the safety of workers and road users.

Traffic controllers will also be in place.

Road users are advised to drive to the conditions and follow the directions of signs and traffic control.

Thank you for your patience during this time.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.