Search form

Publications - Sydney Trains

Sydney Trains produces a number of publications about the organisation for interested parties.

Signalling and Control Systems

Procedures and work instructions for signalling and control systems assets.

 

Doc no. Version Doc name
PR S 40004 FM02 1.0 Investigating Signal Engineer's Signalling Incident Technical Report
PR S 40011 FM01 1.0 Scope of Work Authorisation – Like For Like Work Package
PR S 40011 FM02 1.0 Points Electric Machine Like For Like Renewal
PR S 40011 FM03 1.0 EP Point Air Control Unit Like For Like Renewal
PR S 40011 FM04 1.0 EP Point Motor (without micro-switches) Like For Like Renewal
PR S 40011 FM05 1.0 EP Point Motor (with micro-switches) Like For Like Renewal
PR S 40011 FM06 1.0 Electrical Detector Like For Like Renewal
PR S 40011 FM07 1.0 Indication Box Like For Like Renewal
PR S 40011 FM08 1.0 Plunger Lock Assembly Like For Like Renewal
PR S 40011 FM09 1.0 Signal Like For Like Renewal
PR S 40011 FM10 1.0 Trainstop Like For Like Renewal
PR S 40011 FM11 1.0 Shelf Relay Like For Like Renewal
PR S 40011 FM12 1.0 Releasing Switch Like For Like Renewal
PR S 40011 FM13 1.0 Road Boom Gate Mechanism Like For Like Renewal
PR S 40011 FM14 1.0 Pedestrian Swing Gate Mechanism Like For Like Renewal
PR S 40011 FM15 1.0 Pedestrian Boom Gate Mechanism Like For Like Renewal
PR S 40011 FM16 1.0 Relay Base (plug-in) Like For Like Renewal
PR S 40011 FM17 1.0 Signalling Air-Line Component Like For Like Renewal
PR S 40011 FM18 1.0 TI21 Analogue Track Circuit Transmitter and Power Supply Like for Like Renewal
PR S 40017 FM01 1.0 Return for Signalling Maintenance Tests and Inspections
PR S 40022 FM01 1.0 Signal Apparatus – Mechanical / Relay / Route Control Locking Test Certificate
PR S 40022 FM02 1.0 Signal Apparatus – Design Integrity Test Certificate

Last updated: 15 June 2017

Back to Top