Full load limit back on Scabbing Flat Bridge in time for harvest season

Published

A 42.5-tonne load limit on the Scabbing Flat Bridge at Geurie will be reinstated just in time for the 2025 summer harvest season.

The historic timber truss bridge is a key freight and farming route in the state’s Central West and essential repair and strengthening works have been carried out to restore the bridge to its full load capacity and improve safety for all road users.

Over 15 months of work, repair crews have replaced ageing timber, repaired bridge piers and installed a temporary Bailey bridge to support the structure while truss restoration work continues.

Read the full media release here (PDF, 102.93 KB).