Photos from the various projects making up the Hume Highway duplication.
Image
Widening of pavement on the southern side of the Razorback Range, north of Picton [Sep 1969]
Manoeuvring the centre span, during construction of the Sheahan Bridge over the Murrumbidgee River at Gundagai [Aug 1976]
View of the Tumblong Deviation section 1 [Nov 1983]
Jugiong Bypass construction, SH2 [Aug 1995]
Shot of the Hume Highway
Jugiong Bypass open with traffic on it. SH2 [Oct 1995]
Image controls:
Image
Bridges over the Nepean River and landscaping on the Mittagong Bypass opened to traffic [Jul 1998]
Remembrance Driveway landscaping on the Hume Highway near Sutton Forest south of Berrima [Nov 2001]
Due to mining activity the twin bridge at Douglas Park have moved 60mm. Using hydraulics the bridge was closed to traffic and pushed back into place. [Oct 2007]
View of the duplicated Sheahan Bridge, Hume Highway Gundagai [May 2009]
Coolac Bypass on the Hume Highway. Completed. Taken on the day before the opening. [Aug 2009]
Completed Coolac Bypass on the Hume Highway. Taken after opening. [Aug 2009]
Image controls:
Image
Completed Coolac Bypass on the Hume Highway. Taken after opening. [Aug, 2009]
Hume Highway and Tumbarumba Road. DOES Banners. [Apr 2010]
Table Top Creek before upgrade
Table Top Creek after upgrade [Nov 2010]
Pinch Point program. Hume Highway and Elizabeth Drive, Liverpool. [Apr 2011]