The NSW Government will be carrying out road resurfacing works as part of the major maintenance program scheduled for Canterbury Road and Old Canterbury Road in 2024.

Several sections along Canterbury Road and Old Canterbury Road will undergo maintenance to provide smoother and safer road surfaces with consistent driving conditions.

These works will cover the following areas:

  • Canterbury Road between Chapel Road, Bankstown and Cooks River, Canterbury
  • Old Canterbury Road between Toothill Street and Parramatta Road, Lewisham.

Between March and October 2024 work will include:

  • concrete slab replacement
  • asphalt resurfacing
  • slab jacking
  • crack sealing of joints

To minimise traffic disruption and maintain safety for workers and motorists, working hours are 8pm to 5am, Sunday to Friday, from March to October 2023.

During this work, some parking may be impacted for short periods. Residents will be notified of upcoming parking changes prior to work.

Further detail will be provided to community members as the work progresses at each location. We encourage you to sign up for regular updates and welcome your enquiries and feedback by email info.harbour@connectsydney.com.au or call 1800 735 563

Project information

Fortnightly Update

Allen Street and Fore Street, Canterbury

Crews will commence works on Canterbury Road, between Allen Street and Fore Street, Canterbury, from Monday 18 March 2024, weather permitting.  Work will involve replacing failed concrete slabs and resurfacing deteriorated sections of road at this location.

There will be no work along Canterbury Road between Friday 22 March and Saturday 6 April due to the Easter period.  Work will recommence on Sunday 7 April 2024 at Bexley Road, heading towards Cook River.
 
Our work hours will be between 8pm and 5am, Monday to Thursday, to minimise traffic disruption and maintain safety for workers and motorists, working up to five nights in a row. We will not be working on Friday, Saturday, or public holidays.
 
As part of our work, we will be excavating existing concrete slabs and preparing new slabs with steel reinforcement. We will also be pouring concrete to resurface new sections. Work may be noisy at times and we have put measures in place to reduce the impact of this noise.

Bexley Road and Una Street, Canterbury

Crews will continue works on Canterbury Road, between Bexley Road, Bexley and Una Street, Canterbury, until  Monday 25 March 2024, weather permitting. Work will involve replacing failed concrete slabs and resurfacing deteriorated sections of road at this location.

Our work hours will be between 8pm and 5am, Monday to Thursday, to minimise traffic disruption and maintain safety for workers and motorists. Initial work is expected to take fourteen night shifts, working up to five nights in a row. We will not be working on Friday, Saturday, or public holidays.

As part of our work, we will be excavating existing concrete slabs and preparing new slabs with steel reinforcement. We will also be pouring concrete to resurface new sections.

Work may be noisy at times and we have put measures in place to reduce the impact of this noise.

Project documents

Some documents on this page may not comply with accessibility requirements (WCAG).

If you are having trouble accessing information in these documents, please contact us.

 

Project notifications

Contact us

Phone: 1800 735 563

Email: info.harbour@connectsydney.com.au