Transport for NSW is continuing planning of proposed upgrades to Hill Road at Sydney Olympic Park and Lidcombe to improve connectivity to Carter Street Precinct and Sydney Olympic Park.

Project information

Background

Over the coming years, Hill Road will form an increasingly important road link in a growing and developing part of Sydney’s Central River City.

Proposed Hill Road upgrades will support future development growth in the Carter Street Precinct, which will become home to more than 6,200 new homes, as well as a new primary school and commercial and retail properties.

Upgrades will also improve connectivity to Wentworth Point, Newington, Lidcombe, Sydney Olympic Park and access to Parramatta Road and the M4 Motorway (eastbound) off ramp to Hill Road.

For further information on the Carter Street Precinct visit the Department of Planning, Housing and Infrastructure website.

Benefits

Key benefits include:

  • improved road capacity to meet future traffic growth and connectivity to Carter Street Precinct
  • improved connectivity to Sydney Olympic Park, especially during major events
  • improved connectivity to the neighbouring residential suburbs of Lidcombe, Wentworth Point and Newington
  • improved traffic flow and reduced traffic congestion at Hill Road and Parramatta Road and Hill Road and John Ian Wing Parade intersections
  • improved road safety for all road users
  • reduced travel times for all future road users
  • enhanced active transport links and access to public transport.

Key features

Key features include:

  • widening and upgrading the intersection at Parramatta Road, Hill Road and Bombay Street to provide:
    • dedicated dual right turns from Hill Road into Parramatta Road (westbound)
    • new left turn lane from Parramatta Road into Hill Road (northbound)
    • additional through lane from Bombay Street into Hill Road (northbound)
    • additional right turn lane from Bombay Street into Parramatta Road (eastbound)
  • widening and signalising of the M4 Motorway (eastbound) off ramp into Hill Road to provide:
    • additional left turn lane from M4 Motorway into Hill Road (northbound), creating dual left turns
  • modifying the intersection at Hill Road and Carter Street to prohibit right turn into Carter Street from Hill Road
  • adding a new fourth approach at the intersection of Hill Road and John Ian Wing Parade to provide:
    • main access to Carter Street Precinct through the future Stockyard Boulevard (formerly referred to as Green Spine Road)
    • new dual right lanes from Stockyard Boulevard into Hill Road (northbound)
    • new through lane from Stockyard Boulevarde into John Ian Wing Parade (westbound)
    • new left lane from Stockyard Boulevard into Hill Road (southbound)
  • upgrading the intersection at Hill Road and John Ian Wing Parade to provide:
    • new left lane from Hill Road into Stockyard Boulevard (eastbound)
    • new through lane on Hill Road (southbound)
    • additional right lane from Hill Road into Stockyard Boulevard, creating dual right lanes (eastbound)
    • additional right lane from John Ian Wing Parade into Hill Road, creating dual right turns (southbound)
  • building new shared pathways for pedestrians and cyclists on the western side of Hill Road between Parramatta Road and Carter Street and on the eastern side of Hill Road between Carter Street and Stockyard Boulevard
  • widening footpaths at Hill Road and Parramatta Road and John Ian Wing Parade intersections
  • modifying the kerb on the northwest corner of Birnie Avenue and Parramatta Road intersection to improve B-double and heavy vehicle access.

Next steps

Transport for NSW completed detailed design works in May 2023. The project team is now finalising project planning with construction to commence in 2025.

We will continue to keep the community informed as the project progresses by community notifications and updates to the project webpage.

For the latest information on the Hill Road upgrade project as it continues to progress, subscribe to project updates by sending an email to hill.road@transport.nsw.gov.au.

Community information

Frequently asked questions (FAQs)

 

Please note – documents published before November 2020 contain reference to a westbound off ramp from the M4 Western Motorway at Hill Road. This off ramp is no longer under consideration

Project documents

Some documents on this page may not comply with accessibility requirements (WCAG).

If you are having trouble accessing information in these documents, please contact us.

 

Project notifications

Review of environmental factors

Reports

Contact us

For further information about this project, please contact:

Phone: 1800 979 577 (during business hours)

Email:hill.road@transport.nsw.gov.au