Project documents - Batemans Bay Bridge replacement project
Project overview
View the documents relating to Batemans Bay Bridge replacement project.
Some documents on this page may not comply with accessibility requirements (WCAG).
If you are having trouble accessing information in these documents, please contact us.
Community information
Project updates
- June 2022 project update
Project completion. - March 2022 project update
Foreshore upgrades
March to June 2021 project update
Three month look ahead March to June 2021.September 2019 project update
Three month look ahead July to September 2019.July 2019 project update
July to September look ahead.June 2019 project update
Batemans Bay foreshore designs.- April 2019 project update
April to June 2019 look ahead.
December 2018 project update
Detailed design update.December 2018 project update
January to March 2019 look ahead.October 2018 project update
Three month look ahead October to December 2019.August 2018 project update
Finalising the design and starting early work.
Project notifications
- March 2022 Resident notification
Temporary traffic changes on Wharf Road, Batemans Bay.
November 2021 Resident notification
Night work on the Princes Highway between Beach Road and North Street at Batemans Bay.November 2021 Resident notification
Night work on the Princes and Kings highways at North Batemans Bay.January 2021 project notification
Temporary pedestrian detour at Old Punt Road from January 27 until mid-2021.December 2020 project notification
Widening vehicle turn-around area in Clyde Street west, Batemans Bay.December 2020 project notification
Both Batemans Bay town boat ramps will be open during the peak holiday period.November 2020 project notification
Relocating traffic island at North Street and Clyde Street intersection, Batemans Bay.October 2020 project notification
Out of hours work for segment installation and bridge finishing works from Monday 2 November to mid 2021.October 2020 project notification
Temporary traffic access arrangements for Wharf Road over the Spring and Summer holiday period.September 2020 project notification
Opening of temporary side track and traffic changes at Clyde Street west Batemans Bay in September 2020.September 2020 project notification
We have updated our plan to maintain Clyde River boat ramp access during construction of the Batemans Bay Bridge replacement project.September 2020 project notification
Introduction of new 12 metre vertical height limit for Clyde River marine vessels at Batemans Bay Bridge.June 2020 project notification
Out of hours work for concrete pouring.May 2020 project notification
Temporary 90 minute closures of Clyde Street west boat ramp.May 2020 project notification
Proposed out of hours concrete bridge segment production from 18 May 2020 to late 2020.May 2020 project notification
Out of hours work for segment erection until mid 2021.May 2020 project notification
Pedestrian access changes for temporary side track construction at Clyde Street west Batemans Bay from 11 May 2020.April 2020 project notification
Extension of standard work hours due to COVID-19 pandemic.April 2020 project notification
Access Changes to Wharf Road and Old Punt Road for motorists and pedestrians.February 2020 project notification
Out of hours transport of concrete bridge segments on the Princes Highway.December 2019 letter to residents
Proposed out of hours concrete bridge segment production from 11 January 2020 to September 2020.November 2019 project Out of Hours Work notification
Out of hours work required to complete concrete pouring from Monday 2 December.2019 extension letter to residents
Bridge piling work including possible out of hours work - from Wednesday 23 October 2019.November 2019 notification letter
Night work planned to relocate utilities and remove medians on Princes Highway, north of Batemans Bay Bridge.November 2019 notification letter
Night work planned to remove medians and carry out electrical work on Princes and Kings Highways at Batemans Bay.- September 2019 project notification
Temporary pedestrian changes at Old Punt Road.
August 2019 project notification
Out of hours work on the Princes Highway at Batemans Bay on 19 and 20 August 2019 and opening of temporary new road.July 2019 project notification
Out of hours concrete segment production for bridge constructionfrom July 2019to June 2020.May 2019 project notification
Bridge piling work including possible out of hours work from Monday 6 May 2019.March 2019 project notification
Permanent traffic changes to make way for construction of the new Batemans Bay Bridge.March 2019 project notification
Temporary construction siteto build concrete segments for the Batemans Bay Bridge replacement project, south of Mogo.December 2018 project notification
We’re providing access to Clyde River for boat users at all times during major work by relocating the boat rampat Old Punt Road.
Letter to residents
- October 2018 letter to residents
Work on temporary project offices for the Batemans Bay Bridge replacement project planned from 19 November.
October 2018 letter to residents
Utility work is planned around the Clyde River foreshore area starting 22 October to December 2018.
Frequently Asked Questions (FAQs)
Batemans Bay cultural heritage booklet
- Cultural heritage booklet
Yangary and Bhundoo - Aboriginal places and values around Batemans Bay.
Aboriginal Elders Mentoring Program booklet
- Aboriginal Elders Mentoring Program booklet
Batemans Bay Bridge replacement project.
Reports
Urban Design and Landscape Plan
- Urban Design and Landscape Plan
Consultation Report for the Urban Design and Landscape Plan. - Urban Design and Landscape Plan
Batemans Bay Bridge over Clyde River. - Urban Design and Landscape Plan
Batemans Bay Bridge replacement project. - June 2019 Summary of feedback from the Foreshore Advisory Committee
Batemans Bay Bridge replacement project.
Consistency Reviews
- Consistency review 8 - Changes to existing pier cut off depths
- Consistency review 5 - Stockpile on Kings Highway
Batemans Bay Bridge replacement.
Consistency review 4 - Pier 1 temporary working platform and temporary Bailey bridge
Batemans Bay Bridge replacement.Consistency review 3 - Detailed design changes
Batemans Bay Bridge replacement.Consistency review 2 - Temporary boat ramp
Batemans Bay Bridge replacement.Consistency review 1 - Kings Highway slip lanes and utility adjustment works
Batemans Bay Bridge replacement.Consistency review overview
Batemans Bay Bridge replacement.
Environmental Assessment
- November 2017 environmental assessment overview
Batemans Bay Bridge replacement
Urban Design and Landscape Plan
Summary of recommendations from the Foreshore Advisory Committee
- June 2019 aummary of feedback from the Foreshore Advisory Committee
Batemans Bay Bridge replacement project.
Environmental Impact Statement (EIS)
- November 2017 Environmental impact statement report
Main report.
Appendix C
Biodiversity assessment.Appendix D
Aboriginal Cultural Heritage Assessment.Appendix E
Hydrology and coastal processes assessment.Appendix F
Soils and Geology Assessment.Appendix G
Operational Water Quality Assessment.Appendix H
Traffic and Transport Assessment.Appendix I
Noise and Vibration Assessment.Appendix J
Urban design report and landscape character and visual impact assessment.
Review of Environmental Factors (REF)
- July 2022 Batemans Bay Bridge replacement – Addendum REF 4 – Partial retention of temporary jetty piles
Batemans Bay Bridge replacement.
May 2020 Batemans Bay Bridge Replacement Adddendum REF Floating Pontoon
Batemans Bay Bridge replacement.March 2019 addendum review of environmental factors 2
Batemans Bay Bridge replacement – precast ancillary facility.September 2018 addendum review of environmental factors
Batemans Bay Bridge replacement – former bowling clubhouse demolition.May 2018 submissions report
Review of environmental factors submissions report.November 2017 Review of environmental factors
Main report.Appendix C
Urban design report and landscape character and visual impact assessment.Appendix D
Biodiversity assessment.Appendix E
Hydrology and coastal processes assessment.Appendix F
Soils and Geology Assessment.Operational Water Quality Assessment.
- Appendix H
Aboriginal Cultural Heritage Assessment.
Appendix I
Noise and Vibration Assessment.Appendix J
Traffic and Transport Assessment.- Appendix K
Socio-economic impact assessment.
- Appendix L
Assessment and Statement of Heritage Impact.
Preferred option information
- August 2017 preferred route option report
Batemans Bay Bridge.