Contractors
Contractors working with us are expected to comply with these policies and standards which are held by us or RailSafe.
Policies and standards
- Asset Management Policy (PDF, 404.78 KB)
- Code of Conduct (PDF, 2.96 MB)
- Drug and Alcohol Policy (PDF, 65.5 KB)
- Environment and Sustainability Policy (PDF, 1.44 MB)
- Fatigue Risk Management Policy (PDF, 66.52 KB)
- Health and Safety Policy (PDF, 66.48 KB)
- SMS-06-SP-3026 WHS Risk Management (PDF, 522.59 KB)
- SMS-06-OP-3028 Reporting and Managing Work Health and Safety WHS Hazards (PDF, 214.01 KB)
- SMS-08-OP-3128 Managing Shift Work and Rostering (PDF, 76.67 KB)
- SMS-08-OP-3129 Manage Fatigue Risks (PDF, 100.56 KB)
- SMS-08-FM-4130 Fatigue Risk Profile (DOC, 117 KB)
- SMS-06-OP-3043 Managing Risks Using Safe Work Practices (PDF, 442.28 KB)
- SMS-06-GD-0268 Working Around Electrical Equipment (PDF, 1.96 MB)
- SMS-06-OP-3114 Pre-Work Briefings (PDF, 135.03 KB)
Network rules and network procedures
Our RailSafe website provides safeworking information for people working in the rail corridor.
Safety Management System (SMS) Documents
Contractors need to contact their project managers to get a copy of the applicable SMS document they need.