Gerringong to Bomaderry document library - Foxground and Berry bypass
Project overview
View the Gerringong to Bomaderry document library
Some documents on this page may not comply with accessibility requirements (WCAG).
If you are having trouble accessing information in these documents, please contact us.
Preferred option development
Design and planning reports
- December 2009 oral history
Transcripts from the oral history recordings for the Gerringong to Bomaderry Princes Highway upgrade.
- June 2009 Toolijooa Ridge preferred option report – Addendum One to the preferred option report
The route optimisation process identified two route options crossing the Toolijooa Ridge by different means.
- June 2009 Gerringong and Berry preferred access arrangements report
This report is a summary of design developments for the access arrangements for Gerringong and Berry.
- June 2009 access options submissions summary report
This report provides an overview of the consultation program and a summary and review of the 972 submissions received in response to the display of the access options.
- March 2009 sustainability factors, climate change and economic appraisal
This report presents the findings of further work conducted following an ecologically sustainable development workshop in December 2007.
- February 2009 access value management workshop report
Value management report for the access options at Gerringong and Berry.
Preferred option report
- October 2008 preferred option report
This document has been developed to explain the preferred option development process.
Community updates
- December 2010 community update
Foxground and Berry bypass - Princes Highway.
- November 2009 community update
Princes Highway upgrade - Gerringong to Bomaderry.
- June 2009 community update
Gerringong to Bomaderry - Princes Higwhay upgrade.
- October 2008 community update
Gerringong to Bomaderry.
Letters to the householder
- March 2009 letter to the householder
Gerringong to Bomaderry Princes Highway upgrade.
Maps
- October 2008 Ground conditions
Map showing acid sulfate soils and ground conditions identified during the preferred option process.
- October 2008 Land use
Map showing land-use categorisation identified during the preferred option process.
- October 2008 Daily traffic
Map showing predicted daily traffic patterns identified during the preferred options process.
- October 2008 Heritage in Gerringong
Map showing areas of heritage significance For Gerringong identified during the preferred option process.
- October 2008 Flooding and drainage in Gerringong
Map showing the 1 in 100 year flood limit for Gerringong township as identified during the preferred option process.
- October 2008 Mobility and community amenity in Gerringong
Map showing mobility and community amenity in Gerringong as identified during the preferred option process.
- October 2008 Heritage in Berry
Map showing areas of heritage significance for Berry identified during the preferred option process.
- October 2008 Heritage in Berry - Pulman Street
Map showing areas of heritage significance in the Pulman Street precinct identified during the preferred option process.
- October 2008 Flooding and drainage in Berry
Map showing the 1 in 100 year flood limit for Berry township as identified during the preferred option process.
- October 2008 Mobility and Community Amenity in Berry
Map showing mobility and community amenity in Berry as identified during the preferred option process.
- October 2008 Traffic - existing turning movements in Berry
Map showing existing traffic movements in Berry township as identified during the preferred option process.
Route options development
Design and planning reports
- September 2008 route options submissions report
This report provides an overview of the issues raised from 996 submissions received in response to the project’s route options development report and public display of seven feasible options.
- September 2008 fog monitoring
Key findings from fog monitoring which occurred for a period of 12 months as part of the route options development process from October 2007 to October 2008.
- May 2008 value management report
Value management workshop report.
Route Options Development Report
- November 2007 route options development report
Table of contents and Executive summary.
- Chapter 1
Introduction.
- Chapter 2
Strategic context.
- Chapter 3
Community and stakeholder involvement.
- Chapter 4
Statutory and strategic planning.
- Chapter 5
The existing environment.
- Chapter 6
Design considerations.
- Chapter 7
Development of route options.
- Chapter 8
Description of short listed route options.
- Chapter 9
Project cost, economic analysis and safety.
- Chapter 10
Summary of next steps.
- Appendix A
Route Options Workshop Findings.
- Appendix B
Preliminary Geotechnical Report (Part A).
- Appendix B - part A
Engineering Logs and Core Photographs For Geotechnical Boreholes Part A.
- Appendix B - part B
Engineering Logs and Core Photographs For Geotechnical Boreholes Part B.
- Appendix B - part C
Engineering Logs and Core Photographs For Geotechnical Boreholes Part C.
- Appendix B - part D
Engineering Logs for Test Pits.
- Appendix B - part E
Electric Piezocone Plots and Pore Pressure Dissipation Tests Part A.
- Appendix B - part F
Electric Piezocone Plots and Pore Pressure Dissipation Tests Part B.
- Appendix B - part G
Geological Mapping Results.
- Appendix B - part H
Geotechnical Laboratory Test Results Part A.
- Appendix B - part I
Geotechnical Laboratory Test Results Part B.
- Appendix B - part J
Point Load Test Results.
- Appendix B - part K
Previous Relevant Borehole Logs Part A.
- Appendix B - part L
Previous Relevant Borehole Logs Part B.
- Appendix B - part M
Preliminary Geotechnical Report (Part B).
- Appendix B - part N
Preliminary Geotechnical Report (Part C).
- Appendix C - part A
Preliminary Urban and Regional Design Strategy Part A.
- Appendix C - part B
Preliminary Urban and Regional Design Strategy Part B.
- Appendix D
Preliminary Traffic Assessment Report.
- Appendix E
Preliminary Public Utilities and Services Report.
- Appendix F
Preliminary Social Economic Impacts Report.
- Appendix G - part A
Preliminary Biological Report (Terrestrial Flora and Fauna) Part A.
- Appendix G - part B
Preliminary Biological Report (Terrestrial Flora and Fauna) Part B.
- Appendix G - part C
Preliminary Biological Report (Terrestrial Flora and Fauna) Part B.
- Appendix H
Preliminary Biological Report (Aquatic Ecology and Water Quality Management).
- Appendix I - part A
Preliminary Indigenous and Non-Indigenous Heritage Assessment Part A.
- Appendix I - part B
Preliminary Indigenous and Non-Indigenous Heritage Assessment Part B.
- Appendix I - part C
Preliminary Indigenous and Non-Indigenous Heritage Assessment Part C.
- Appendix J
Preliminary Air Quality Management Report.
- Appendix K - part A
Preliminary Flooding and Drainage Report Part A.
- Appendix K - part B
Preliminary Flooding and Drainage Report Part B.
- Appendix L
Preliminary Planning and Zoning Issues Report.
- Appendix M - part A
Preliminary Land Use Issues Report Part A.
- Appendix M - part B
Peliminary Land Use Issues Report Part B.
- Appendix M - part C
Preliminary Land Use Issues Report Part C.
- Appendix M - part D
Preliminary Land Use Issues Report Part D.
- Appendix M - part E
Preliminary Land Use Issues Report Part E.
- Appendix M - part F
Preliminary Land Use Issues Report Part F.
- Appendix N
Preliminary Traffic Noise and Vibration Assessment Report.
- Appendix O
Preliminary Property Impacts Report.
- Appendix P
Preliminary Climatic Assessment Report.
- Appendix Q
Preliminary Cumulative Effects Report.
- Appendix R
Road Safety Audit - Stage 1, Route Options - Preliminary Concept Design.
Peer Review
- May 2008 peer review
Route optimisation peer review - Connell Wagner report 2008.
Community updates
- November 2007 community update
Gerringong to Bomaderry option display.
- July 2007 community update
Gerringong to Bomaderry.
- April 2007 community update
Gerringong to Bomaderry.
- January 2007 community update
Gerringong to Bomaderry.
Letters to the householder
- June 2008 letter to the householder
Decision making for the Princes Highway Gerringong to Bomaderry.
Maps
- November 2007 long list of route options
Map of all route options.
- November 2007 cultural heritage
Map showing areas of heritage significance identified during the route options development process.
- November 2007 traffic patterns
Map showing existing peak hour traffic patterns identified during the route options development process.
- November 2007 flooding and drainage
Map showing 1 in 100 year flood limits identified during the route options development process.
- November 2007 flora and fauna
Map showing threatened flora and fauna species identified during the route options development process.
- November 2007 ground conditions
Map showing acid sulfate soils and ground conditions identified during the route options development process.
- November 2007 land use
Map showing land-use categorisation identified during the route options development process.
- November 2007 public utilities
Map showing major public utilities identified during the route options development process.
- November 2007 planning and zoning
Map showing planning and zoning land classifications identified during the route options development process.
Community consultation
- April 2007 meeting notes
Interest group information 2007.
- February 2007 presentation
Interest group information session presentation.
- February 2007 meeting notes
Community information session meeting notes.
- February 2007 presentation
Information session – introduction to the project team and project progress.
Pre-2007 and previous studies
Planning focus meeting
- October 2006 meeting report
Summary of key issues raised at the Gerringong to Bomaderry Princes highway upgrade planning focus meeting 29 September 2006.
Community updates
- September 2006 community update
Gerringong to Bomaderry.
- March 2006 community update
Gerringong to Bomaderry.
Community consutlation
- June 2006 community consultation report
Community consultation report.
- May 2006 meeting notes
Workshop meeting notes.
- May 2006 presentation
Community involvement in the development of route options for the upgrade of the Princes Highway between Gerringong and Bomaderry.
Value management work report - 1996
- March 1996 Princes Highway Berry bpass project value management study report
Report on the value management workshop held on 13 and 14 March 1996. This study was part of a process that was terminated in 1998 by the then NSW Government.
Previous studies
- September 2006 Quantm study
What is the Quantm study?.
- September 2006 Berry bypass study
Review of the 1996 Berry bypass study.
- September 2006 Gerringong to Berry route study
Review of the route evaluation study undertaken in 1991 for the Princes Highway from Gerringong to Berry.