Community information
Project updates
- December 2016 project update
Foxground and Berry bypass.
- June 2016 project update
Foxground and Berry bypass.
- February 2016 project update
Foxground and Berry bypass.
- March 2015 project update
Foxground and Berry bypass.
- September 2014 project update
Foxground and Berry bypass.
Project notifications
- December 2014 project notification
Weekend work on Princes Highway between Toolijooa Road and Tindalls Lane, 13 & 14 December 2014.
Letters to the householder
- May 2014 letter to the householder
Foxground and Berry bypass, Princes Highway upgrade.
July 2013 letter to the householder
Foxground and Berry bypass, Princes Highway upgrade.- May 2013 letter to the householder
Foxground and Berry bypass, Princes Highway upgrade Submissions report.
June 2012 letter to the householder
Foxground and Berry bypass, Princes HIghway upgrade, NSW Government announces northern alignment for environmental assessment.- May 2012 letter to the householder
Foxground and Berry bypass, Princes Highway upgrade Southern Berry bypass review update and next steps.
Displays and posters
- June 2017 postcard invitiation
You are invited to a community celebration event - Walk the Berry bypass.
- July 2014 Bridge at Berry poster
This poster shows the bridge at Berry and highlights changes from the Approved Concept Design.
- July 2014 Broughton Creek Bridges 1,2 and 3 poster
This poster shows Broughton Creek bridges 1, 2 and 3 and highlights changes from the Approved Concept Design.
- July 2014 Kangaroo Valley Road overbridge poster
This poster shows the Kangaroo Valley Road overbridge and highlights changes from the Approved Concept Design.
- July 2014 Tindalls Lane overbridge poster
This poster shows the Tindalls Lane overbridge.
- July 2014 Austral Park Road interchange poster
This poster shows the Austral Park Road Interchange and highlights changes from the Approved Concept Design.
- July 2014 Berry North interchange poster
This poster shows the Berry North Interchange and highlights changes from the Approved Concept Design.
- July 2014 Berry South/ Kangaroo Valley Road interchange poster
This poster shows the Berry South/Kangaroo Valley Road Interchange and highlights changes from the Approved Concept Design.
- July 2014 Tindalls Lane interchange poster
This poster shows the Tindalls Lane interchange and highlights changes from the Approved Concept Design.
- July 2014 Toolijooa Road interchange poster
This poster shows the Toolijooa Road interchange and highlights changes from the Approved Concept Design.
- July 2014 pedestrian and cycle paths poster
This poster shows pedestrian and cycle path arrangements in proximity to the Berry Township.
- July 2014 Berry North entranceway poster
This poster shows the planned location of the David and Alexander Berry Memorial, north of Berry.
- July 2014 Berry South entranceway poster
This poster shows the proposed key features of the Kangaroo Valley Road overbridge, designed to be the Berry South entranceway.
- July 2014 proposed finishes poster
This poster shows the key finishes proposed for major elements of the bypass.
- July 2014 Huntingdale Park Road noise mound/wall poster
This poster shows the Huntingdale Park Road noise mound/wall and highlights changes from the Approved Concept Design.
- July 2014 North Street noise mound poster
This poster shows the North Street noise mound and highlights changes from the Approved Concept Design.
- July 2014 fauna crossings poster
This poster provides information on proposed fauna crossings.
- July 2014 vegetation management poster
This poster provides information on vegetation management strategies.
- July 2014 project flow chart poster
This Flowchart highlights key project phases.
November 2012 display poster
Concept design.- November 2012 display poster
Make a submission.
- November 2012 display poster
Flooding.
- November 2012 display poster
Traffic and transport.
- November 2012 display poster
Aboriginal cultural heritage.
- November 2012 display poster
Non-Aboriginal (historic) heritage.
- November 2012 display poster
Flora and fauna.
- November 2012 display poster
Victoria Street design options.
Community updates
- November 2012 community update
Foxground and Berry bypass, Princes Highway upgrade.
- October 2012 community update
Foxground and Berry bypass, Princes Highway upgrade.
Reports
Urban and landscape design community feedback report
- February 2015 urban and landscape design community feedback report
Feedback received about the urban and landscape design has been collated into a Community Feedback Report.
- October 2014 presentation
Presentation from the urban design and landscaping workshop held 28 October 2014.
- October 2014 feedback form
A copy of the feedback form from the workshop held on 28 October 2014.
Community Consultation Strategy
- July 2015 community consultation strategy report
Foxground and Berry bypass.
Toolijooa Road Fill work construction environment plan
- February 2014 Approval letter from the Department of Planning and Infrastructure
Approval letter from the Department of Planning and Infrastructure.
- February 2014 staging report
Toolijooa Road Fill Works stage of Foxground and Berry bypass project: Staging Report, 11 November 2013 (Revision 3).
Construction Environment Management Plan (CEMP) - Stage 1
- February 2014 construction environment management plan
Construction Environmental Management Plan Toolijooa Road Fill Works Stage of Foxground and Berry Bypass Project, January 2014 (Revision 1).
- Appendix B1
Construction Traffic Management Sub Plan Toolijooa Road Fill Works Stage of Foxground and Berry Bypass, January 2014 (Revision 4).
- Appendix B2
Flora and Fauna Management Sub Plan Toolijooa Road Fill Works Stage of Foxground and Berry Bypass, January 2014 (revision 4).
- Appendix B3
Construction Noise and Vibration Management Sub Plan Toolijooa Road Fill Works Stage of Foxground and berry Bypass, January 2014 (Revision 4).
- Appendix B4
Soil and Water Quality management Sub Plan Toolijooa Road Fill Works Stage of Foxground and Berry Bypass, January 2014 (revision 4).
- Appendix B5
Construction Heritage Management Sub Plan Toolijooa Road Fill Works Stage of Foxground and Berry Bypass, January 2014 (Revision 4).
Compliance Tracking Program
- February 2014 compliance tracking program report
Compliance tracking program Toolijooa Road Fill Works Stage of Foxground and Berry Bypass, January 2014 (Revision 4).
Community Communications Strategy
- February 2014 community communications strategy report
Community Communications Strategy Foxground and berry Bypass Stage one: Toolijooa Road Fill Works, January 2014 (revision 2).
Landscape and Revegetation Management Sub Plan
- February 2014 landscape and revegetation management sub plan report
Toolijooa Road fill Works Stage of Foxground and Berry Bypass Project landscape and Revegetation management Sub Plan, January 2014 (Report 4).
Construction compliance report
- October 2014 completion report stage 1
Toolijooa Road Fill Works Stage of Foxground and Berry Bypass.
Conditions of Approval project documents
Construction and Environment Management Plan - Stage 2
- September 2017 construction and environment mangement plan
Stage 2 of Foxground and Berry bypass.
- Appendix A1
Legal and other requirements.
- Appendix A3
Environmental aspects, impacts and risk assessment.
- Appendix A4
Environmental policy.
- Appendix A5
Ancillary Facilities Assessment.
- Appendix A7
Environmental Incident Classification and Reporting Procedure.
- Appendix A8
Environmental inspection checklist.
- Appendix B1
Construction Traffic Management Sub-plan.
- Appendix B2
Construction Flora and Fauna Management Sub-plan.
- Appendix B3
Construction Noise and Vibration Management Sub-plan.
- Appendix B4
Construction Soil and Water Quality Management Sub-plan.
- Appendix B5
Construction Heritage Management Sub-plan.
- Appendix B6
Construction Air Quality Management Sub-plan.
- Appendix B7
Construction Waste and Energy Management Sub-plan.
Biodiversity offset strategy
- October 2016 biodiversity offset package
Princes Highway Upgrade - Foxground and Berry Bypass project.
- October 2014 biodiversity offset strategy report
Princess Highway Upgrade - Foxground and Berry Bypass project.
Fauna Crossing report
- November 2014 fauna crossing report
Princess Highway - Foxground and Berry Bypass.
Ecological monitoring program
- Post construction ecological monitoring annual report 2020
- Post construction ecological monitoring annual report 2020
- FBB Aquatic Monitoring Annual Report 2019
- FBB Aquatic Monitoring Annual Report 2019 - Aquatic Monitoring photographs
- FBB Aquatic Monitoring Annual Report 2018
- FBB Nest Box Monitoring Annual Report 2018
- FBB Post-construction Ecological Monitoring Annual Report 2018
- FBB Weed Monitoring Report 2018
- September 2014 Ecological monitoring program report
Princes Highway Upgrade - Foxground and Berry Bypass Project.
Water quality monitoring program
- July 2016 surface water monitoring plan report
Princes Highway Upgrade - Foxground to Berry Bypass project.
- July 2014 ground water monitoring plan report
Princes Highway Upgrade - Foxground to Berry Bypass project.
Glen Devon reports
- September 2014 Glen Devon heritage interpretation plan
Interpretation Plan for G2B H11 'Glen Devon' for the proposed ancillary facilities, Princes Highway Upgrade Foxground and Berry Bypass.
- June 2013 Glen Devon cultural heritage assessment documentary and physical investigation report
Cultural Heritage Assessment Documentary and Physical Investigation.
Non-Aboriginal heritage
- November 2014 Non-Aboriginal archival recording
Archival Report.
- Non-Aboriginal historical research report
Foxground to Berry Bypass Historic Period Assessment and Statement of Heritage Impact for Items G2B H60, G2B H61, G2B H63 and SICPH CL.
- September 2014 Non-Aboriginal archaeological investigation report
Foxground and Berry Bypass: Archaeological Investigation Report.
- July 2014 Non-Aboriginal archaeological methodology report
Foxground and Berry Bypass: Archaeological Methodology.
Compliance tracking program
- September 2014 compliance tracking program report
Foxground and Berry bypass.
Nest Box Management Plan
- February 2017 nest box management plan report
Foxground and Berry bypass - Princes Highway upgrade.
Microbat Management Plan
- April 2015 microbat management plan
Foxground and Berry bypass - Princes Highway upgrade.
Urban Design and Landscape Plan
- September 2014 urban design and landscape plan report
Foxground and Berry bypass - Princes Highway upgrade.
Construction Compliance reports
- CSR 10 – FBB Construction Compliance Report 10
- CSR 10 - Appendix A
- Construction Compliance Status Report 9
October 2018 to March 2019.
- Construction Compliance Status Report 8
April 2018 to September 2018.
- Construction Compliance Status Report 7
October 2017 to March 2018.
- Construction Compliance Status Report 6
May 2017 to September 2017.
- Construction Compliance Status Report 5
November 2016 to April 2017.
- Construction Compliance Status Report 4
May 2016 to October 2016.
- Construction Compliance Status Report 3
November 2015 to April 2016.
- Construction Compliance Status Report 2
May 2015 to October 2015.
- Construction Compliance Status Report 1
October 2014 to April 2015.
- Compliance Status Report
September 2014.
Operational Noise Management Report
- March 2015 operational noise management report
Design Report: Operational Noise Management.
Environmental Assessment documents
Conditional of Approval project documents
- February 2014 major project application
Major project application document.
- February 2014 conditions of approval
Minister's Conditions of Approval outlining the requirements set by the Minister for Planning and Infrastructure for the project.
- July 2015 C4 modification
- January 2015 C13 modification
Updated Conditions of Approval.
- July 2017 C15 modification
Approval Letter.
- July 2017 C15 modification
Updated Conditions of Approval.
- September 2017 C15 and C16 modification
Updated Conditions of Approval.
Approved Concept Design
- July 2013 approved concept design
This Poster shows the approved concept design on a map.
Submissions report
- May 2013 submissions report
The submissions report provides responses to issues raised in submissions received from the community, interest group and stakeholders.
Refined Concept Design
- May 2013 refined concept design map
This poster shows the refined concept design on a map.
- May 2013 Victoria Street access arrangements
This poster shows the Victoria Street access arrangements on a map.
- May 2013 Victoria Street access arrangements (printable version)
This printable poster shows the Victoria Street access arrangements on a map.
Environmental Assessment Report
- November 2012 environmental assessment report
Main report.
- November 2013 Appendices
Table of Contents.
- November 2013 appendices A-E
A - Director-General's requirements, B - Minister's order under Part 3A of the EP&A Act, C - Community Consultation, D - Traffic and Transport and E - Noise and Vibration.
- November 2013 appendices F-I
F - Terrestrial Flora and Fauna, G - Aquatic ecology and water quality management, H - Surface water, groundwater and flooding and I - Urban Design.
- November 2013 appendices J-O
J - Aboriginal Cultural Heritage, K - Non-Aboriginal (historic) heritage, L - Property access impacts, M - Socio-economic, N - Air Quality and O - Greenhouse gas and Climate Change.
Regional Manager's update
- February 2013 regional manager's update
Regional Manager's update 6 February 2013.
Process flowchart
- July 2013 process flowchart
Foxground to Berry bypass environmental assessment flowchart.
Gazetted Declaration 2012
- September 2012 gazetted declaration
The Department of Planning declared this to be a project of regional significance to which Part3A of the Environmental Assessment and Planning Act, 1979 Applies.
Director-General's requirements
- February 2011 Director-General's requirements
The Director General of the NSW Department of Planning has provided a list of requirements to be addressed by the environmental assessment of this proposal.
Preliminary Environmental Assessment
- December 2010 preliminary environmental assessment report
A preliminary environmental assessment for the proposal was submitted to the Department of Planning in December 2010.
Industry Briefings
- November 2012 industry briefing presentation
Roads and Maritime Services presented at an industry briefing in November 2012. Peter letts General Manager Project management addressed industry leaders about the Foxground and Berry bypass.
Southern Bypass review
External Review of RMS findings
- June 2012 external review of RMS findings
Updated 29 June 2012. Report prepared by the Independent Reviewer on the Berry Bypass route comparison.
Draft Terms of Reference
- March 2012 draft terms of reference
This draft Terms of Reference provides the scope and intent for an independent examination of the Berry bypass southern route review process.
Report on Route feasibility
- June 2012 addenda to report on route feasibility cost estimates
Updated on 29 June, this is a list of addenda items included in the Report on Route Feasibility Cost estimates, June 2012.
Route feasibility cost estimate
- June 2012 executive summary
Updated 29 June 2012. Report prepared by RMS Technical Investigation Group.
- June 2012 report on route feasibility compatative cost esimates
Updated 29 June 2012. Report prepared by RMS Technical Investigation Group.
- Appendix A1 - Investigation Overview
These report Appendices include: The terms of reference for technical investigations group, qualifications of the members in the technical investigations group and independent reviewers.
- Appendix B1 - Design
These report appendices include the original design submission for the southern bypass route, the concept design criteria and addendum design criteria for the Princes Highway Gerringong.
- Appendix C1 - Flooding Investigations
This report appendix includes the flood investigation graphics.
- Appendix D1 - Geotechnical investigations Map 1 of 4
This report appendix is 1 of 4 maps showing the locations geotechnical testing for the southern Berry bypass route.
- Appendix D1 - Geotechnical Investigations Map 2 of 4
This report appendix is 2 of 4 maps showing the locations of geotechnical testing for the southern Berry bypass route.
- Appendix D1 - Geotechnical Investigations Map 3 of 4
This report appendix is 3 of 4 maps showing the locations of geotechnical testing for the southern Berry bypass route.
- Appendix D1 - Geotechnical Investigations Map 4 of 4
This report appendix is 4 of 4 maps showing the locations of geotechnical testing for the southern Berry bypass Route.
- Appendix D2 - Geotechnical Investigations Report - Part 1
This report appendix is the RMS Factual Geotechnical Report for the southern Berry bypass route.
- Appendix D2 - Geotechnical Investigations Report - Part 2
This report appendix shows the results from the borehole geotechnical testing undertaken for the southern Berry bypass route.
- Appendix D2 - Geotechnical Investigations Report - Part 3
This report appendix shows the results taken from borehole geotechnical testing undertaken for the southern Berry bypass route.
- Appendix D2 - Geotechnical Investigation Report - Part 4
This report appendix shows the results from borehole geotechnical testing undertaken for the southern Berry bypass route.
- Appendix D2 - Geotechnical Investigation Report - Part 5
This report appendix shows the results from borehole geotechnical testing undertaken for the southern Berry bypass route.
- Appendix D2 - Geotechnical Investigation Report - Part 6
This report appendix shows the results from cone penetration testing undertaken for the southern Berry bypass route.
- Appendix D2 - Geotechnical Investigation Report - Part 7
This report appendix shows the results from pore pressure dissipation and geotechnical laboratory testing undertaken for the southern Berry bypass route.
- Appendix D2 - Geotechnical Investigation Report - Part 8
This report appendix shows the results from geotechnical laboratory testing undertaken for the southern Berry bypass route.
- Appendix D2 - Geotechnical Investigations Report - Part 9
This report appendix shows the results from geotechnical laboratory testing undertaken for the southern Berry bypass route.
- Appendix D2 - Geotechnical Investigations Report - Part 10
This report appendix shows the results from geotechnical laboratory testing undertaken for the southern Berry bypass route.
- Appendix D2 - Geotechnical Investigations Report - Part 11
This report appendix shows the results from geotechnical laboratory testing undertaken for the southern Berry bypass route.
- Appendix D2 - Geotechnical Investigations Report - Part 12
This report appendix shows the results from geotechnical laboratory testing undertaken for the southern Berry bypass route.
- Appendix D3 - Geotechnical Investigations
This report appendix is a report outlining the soil compressibility and acid sulphate soil issues for the southern Berry bypass route.
- Appendix E1 - Utility interfaces investigation
This report appendix is a memorandum from Railcorp regarding possible crossing of the rail corridor for the southern Berry bypass route.
- Appendix F1 and F2 - Construction Methodology
These report appendices include the construction method statements for major structures and bulk earthworks.
- Appendix G1 and G2 - Design and Construction program
These report appendices include the detailed design and construction programs for the northern and southern Berry bypass routes.
- Appendix H1 - Cost Estimate
Updated 29 June 2012. This report appendix includes the cost breakdown of infrastructure items for the northern and southern Berry bypass routes.
- Addenda to Route Feasibility Cost Estimation Report
Updated 29 June 2012. Addenda to the report on Route Feasibility Cost Estimates, June 2012.
Supporting Financial Documentation
- June 2012 spreadsheet printouts and summaries - Northern Route
Updated on 29 June. Spreadsheet printouts and summaries - northern route.
- June 2012 spreadsheet printouts and summaries - Southern Route
Updated on 29 June. Spreadsheet printouts and summaries - Southern Route.
- June 2012 project management office - Concurrence Report
Updated 29 June 2012. Project Management Office - Concurrence Report.
Issues, Actions and Outcomes Register
- June 2012 summary of the issues, actions and outcomes register
In order to assist the community with understanding the Issues, Actions and Outcomes Register, we have created an abbreviated version that summarises some of the major issues.
- May 2012 issues, actions and outcomes register
Previously called the Critical issues Register, this document tracks all of the critical technical questions being raised by the community with the actions and outcomes - updated on 29 May.
Regional Manager's update
- July 2012 regional manager's message
Regional Manager's message - 17 July 2012.
- July 2012 regional manager's message
Regional Manager's Message - 10 July 2012.
- June 2012 regional manager's message
Regional Manager's Message - 19 June 2012.
- June 2012 regional manager's message
Regional Manager's Message - 12 June 2012.
- June 2012 regional manager's message
Regional Manager's Message - 5 June 2012.
- May 2012 regional manager's message
Regional Manager's Message - 29 May 2012.
- May 2012 regional manager's message
Regional Manager's Message - 22 May 2012.
- May 2012 regional manager's message
Regional Manager's Message - 15 May 2012.
- May 2012 regional manager's message
Regional Manager's Message - 8 May 2012.
- May 2012 regional manager's message
Regional Manager's Message - 1 May 2012.
- April 2012 regional manager's message
Regional Manager's Message - 24 April 2012.
- April 2012 regional manager's message
Regional Manager's Message - 17 April 2012.
- February 2012 regional manager's message
Media releases
Factsheets
- June 2012 factsheet
How the cost estimates have been made.
- May 2012 factsheet
Overview of the Southern bypass route Report and Decision Process.
- May 2012 factsheet
Independent Reviewers update - Berry bypass review 23 May 2012.
- May 2012 factsheet
Kangaroo valley Road Interchange.
- May 2012 factsheet
Design development and costing.
- May 2012 factsheet
Independent Reviewers Update - Berry bypass review 8 May 2012.
- April 2012 factsheet
Independance of the process.
- March 2012 factsheet
Geotech fact sheet.
- February 2012 factsheet
Costing fact sheet.
Display panels
- June 2012 display panel
Preferred Berry Bypass Alignment.
- June 2012 display panel
Preferred Berry Bypass alignment - Kangaroo Valley Road Interchange.
Revised Southern Berry Bypass location review
- April 2012 revised location
Revised southern Berry bypass review location.
- March 2012 revised location
Revised southern Berry bypass review location.
- January 2012 preliminary location
Preliminary suggested southern Berry bypass location.
Meeting notes
- July 2012 meeting notes
Community Q&A Session southern Berry bypass review meeting notes - 3 July 2012.
- July 2012 meeting notes
Meeting Notes from discussion on the issues analysis for questions and comments about the investigations into the southern route made by the southern route proponents.
- July 2012 meeting notes
Updated 17 July 2012. Issues analysis for questions and comments about the investigations into the southern route made by the southern route proponents.
- July 2012 meeting notes
Adjustment sums cost estimate breakdown. Additional information provided at meeting with southern route proponents on 3 July 2012.
- July 2012 meeting notes
Berry Bridge cost estimate breakdown. Additional information provided at meeting with southern route proponents on 3 July 2012.
- July 2012 meeting notes
Imported fill cost estimate breakdown. Additional information provided at meeting with southern route proponents on 3 July 2012.
- July 2012 meeting notes
Local roads cost estimate breakdown. Additional information provided at meeting with southern route proponents on 3 July 2012.
- July 2012 meeting notes
Adjustment sums and provisional items handout. Additional information provided at meeting with southern route proponents on 3 July 2012.
- July 2012 meeting notes
Direct cost comparisons including property information. Additional information provided at meeting with southern route proponents on 3 July 2012.
- April 2012 meeting notes
Q & A session southern Berry bypass review meeting notes- 30 April 2012.
- March 2012 meeting notes
Q & A session southern Berry bypass review meeting notes- 19 March 2012.
- March 2012 meeting notes
Meeting between Bruce Ramsay and Steve Zhivanovich to discuss design development of the southern suggestion.
- March 2012 meeting notes
Q & A session southern Berry bypass review meeting notes - 1 March 2012.
- March 2012 meeting notes
Meeting notes from updated southern Berry bypass route design - 1 March 2012.
- February 2012 meeting notes
Meeting notes from 16 February 2012.
- February 2012 meeting notes
Meeting notes from 15 February 2012.
- January 2012 meeting notes
Meeting notes from 31 January 2012.
- January 2012 meeting notes
Meeting notes from 24 Janaury 2012.
Presentations
- July 2012 presentation
Southern Berry bypass review Q & A presentation - 3 July 2012.
- April 2012 presentation
Southern Berry bypass review Q & A presentation - 30 April 2012.
- March 2012 presentation
Southern Berry bypass review Q & A presentation - 19 March 2012.
- March 2012 presentation
Southern Berry bypass review Q & A presentation - 1 March 2012.
- March 2012 presentation
Southern Berry bypass review Q & A presentation - 16 February 2012.
Community questions
- July 2012 community questions
Responses to visitor enquiries at Berry project office and calls to 1800 project information line from 25 June to 6 July 2012.
Technical investigation group
- February 2012 technical investigation group overview
Technical Investigation group overview.
- February 2012 status report
Technical investigation group status report 1 - 24 February 2012.
TIG meeting notes
- May 2012 meeting notes
16 May 2012 Technical Investigation Group meeting notes.
- May 2012 meeting notes
2 May 2012 Technical Investigation Group meeting notes.
- April 2012 meeting notes
26 April 2012 Technical Investigation Group meeting notes.
- April 2012 meeting notes
18 April 2012 Technical Investigation Group meeting notes.
- April 2012 meeting notes
4 April 2012 Technical Investigation Group meeting notes.
- March 2012 meeting notes
28 March 2012 Technical Investigation Group meeting notes.
- March 2012 meeting notes
21 March 2012 Technical Investigation Group meeting notes.
- March 2012 meeting notes
14 March 2012 Technical Investigation Group meeting notes.
- March 2012 meeting notes
7 March 2012 Technical Investigation Group meeting notes.
- February 2012 meeting notes
29 February 2012 Technical Investigation Group meeting notes.
- February 2012 meeting notes
21 February 2012 Technical Investigation Group meeting notes.
- February 2012 meeting notes
14 February 2012 Technical Investigation Group meeting notes.
- February 2012 meeting notes
3 February 2012 Technical Investigation Group meeting notes.
Submission for Southern route
- May 2012 submission
Submission for southern route with balanced earthworks - strategic estimate.
- May 2012 submission
Submission for southern route with balanced earthworks - cross section pages 1- 29.
- May 2012 submission
Submission for southern route with balanced earthworks - cross section pages 30 - 58.
- May 2012 submission
Submission for southern route with balanced earthworks - plan.
Review Submission - December 2011
- December 2011 review submission
Resident submission to RMS about a possible southern Berry alternative.
Berry Bridge and Northern Interchange
Urban design report
- May 2012 urban design draft report
Berry bridge and northern interchange urban design 80% draft report for comment. Presented to working group 2 May 2012.
Bridge design options
- March 2012 options for comment
Four shortlisted bridge designs, for community comment - 28 March 2012.
Meeting notes
- May 2012 meeting notes
Berry bridge and northern interchange working group meeting notes - 2 May 2012.
- May 2012 meeting notes
Berry bridge and northern interchange working group handouts - 2 May 2012.
- March 2012 meeting notes
Berry bridge and northern interchange working group meeting notes - 28 March 2012.
- March 2012 meeting notes
Berry bridge and northern interchange working group meeting notes - 7 March 2012.
Presentations
- March 2012 presentation
Berry bridge and northern interchange presentation - 28 March 2012.
- March 2012 presentation
Conebeare Morrison presentation - Berry Bridge and Norther Interchange precinct - 28 March 2012.
- March 2012 presentation
Berry bridge and northern interchange working group presentation - 7 March 2012.
- March 2012 presentation
Conebeare Morrison presentation - Berry bridge and northern interchange working group - 7 March 2012.
Kangaroo Valley Road interchange and Victoria Street precinct working group
Victoria Street fact sheet
- August 2012 fact sheet
RMS is planning to close Victoria Street as part of the proposed Foxground and Berry bypass - Fact Sheet August 2012.
Letter to the householder
- August 2012 letter to the householder
Proposed Victoria Street closure - August 2012.
Urban design report
- July 2012 urban design report
Kangaroo Valley Road interchange and Victoria Street precinct urban design 80% report. Presented to working group 25 July 2012. Part 1.
- July 2012 urban design report
Kangaroo Valley Road interchange and Victoria Street precinct urban design 80% report. Presented to working group 25 July 2012. Part 2.
Victoria Street options
- July 2012 option 1
Victoria Street closed.
- July 2012 option 2
Victoria Street open to two way access.
- July 2012 option 3
Victoria Street open to one way access.
Meeting notes
- July 2012 meeting notes
Kangaroo Valley Road and Victoria Street precinct - 25 July 2012.
- May 2012 meeting notes
Internal project team workshop meeting to discuss the preferred option for the purpose of the environmental assessment from the three design options for Victoria Street.
- April 2012 meeting notes
Kangaroo Valley Road and Victoria Street precinct - 17 April 2012.
- March 2012 meeting notes
Kangaroo Valley Road and Victoria Street precinct - 29 March 2012.
- March 2012 meeting notes
Kangaroo Valley Road and Victoria Street precinct - 8 March 2012.
- January 2012 meeting notes
Kangaroo Valley Road and Victoria Street precinct - Victoria Street discussions - January 2012.
Table working group maps for discussion
- May 2012 working group map A
Kangaroo Valley Road interchange and Victoria Street precinct table working group maps for discussion - 16 May 2012.
- May 2012 working group map B
Kangaroo Valley Road interchange and Victoria Street precinct table working group maps for discussion - 16 May 2012.
- May 2012 working group map C
Kangaroo Valley Road interchange and Victoria Street precinct table working group maps for discussion - 16 May 2012.
Presentations
- July 2012 presentation
RMS Presentation 25 July 2012.
- April 2012 presentation
Community member presentation - 17 April 2012.
- April 2012 presentation
Kangaroo Valley Road, Mark Radium Park, Victoria Street presentation - 17 April 2012.
- March 2012 presentation
Conebeare Morrison presentation - Kangaroo Valley Road Interchange and Victoria Street - 29 March 2012.
- March 2012 presentation
Kangaroo Valley Road, Mark Radium Park, Victoria Street presentation - 29 March 2012.
- March 2012 presentation
Kangaroo Valley Road and Victoria Street precinct presentation - 8 March 2012.
RMS origin and destination traffic survey
- July 2012 RMS traffic presentation
Further data provided for the origin-destination surveys after the RMS presentation of traffic assessment of the Victoria Street design options, presented at the Berry Alliance community for.
- June 2012 survey
RMS traffic assessment of Victoria Street design options presented at a Berry Alliance community forum on 14 June 2012.
North Street precinct working group
North Street precinct urban design draft report
- May 2012 urban design draft report
North Street precinct urban design 80% draft report for comment. Presented to working group 14 May 2012.
Meeting notes
- May 2012 meeting notes
North Street Precinct working group meeting notes - 14 May 2012.
- April 2012 meeting notes
North Street Precinct working group meeting notes - 2 April 2012.
- February 2012 meeting notes
North Street Precinct working group meeting notes - 29 February 2012.
Presentations
- May 2012 presentation
North Street Precinct working group presentation - 14 May 2012.
- April 2012 presentation
Conebeare Morrison presentation - North Street Precinct working group - 2 April 2012.
- April 2012 presentation
North Street Precinct working group presentation - 2 April 2012.
- April 2012 presentation
North Street Precinct - study area for pedestrian bridge - 2 April 2012.
- February 2012 presentation
North Street Precinct working group presentation - 29 February 2012.
- February 2012 presentation
Conebeare Morrison presentaton - North Street precinct working group meeting - 29 February 2012.
Austral Park Road interchange and Heavy Vehicle Rest Area working group
Letters to the householder
September 2012 letter to the householder
Foxground and Berry bypass, Princes Highway upgrade - heavy vehicle rest area no longer proposed near Austral Park Road.
Meeting notes
- April 2012 meeting notes
REVISED MEETING NOTES Austral Park Road and heavy vehicle rest area working group meeting notes - 16 April 2012.
- April 2012 meeting notes
Austral Park Road and heavy vehicle rest area working group meeting notes - 16 April 2012.
- March 2012 meeting notes
Austral Park Road and heavy vehicle rest area working group meeting notes - 5 March 2012.
Presentations
- April 2012 presentation
Austral Park Road and heavy vehicle rest area working group presentation - 16 April 2012.
- April 2012 presentation
Austral Park Road Interchange options - 16 April 2012.
- March 2012 presentation
Austral Park Road and heavy vehicle rest area working group presentation - 5 March 2012.
Community review group
Berry bypass alignment issues report
- January 2012 issues report
This report provides a summary and review of submissions received in response to the changes to the concept design for the Berry bypass resulting from the Berry community review group discuss.
Community review group option review report
- December 2011 report
Main report.
- Appendix 1
Document list.
- Appendix 2
Bridge design workshops process report.
- Appendix 3
RMS Early 2011 Concept Design.
- Appendix 4
RMS Potential Alternative Alignments.
- Appendix 5
RMS Berry Bridge Options 1,2 & 3.
- Appendix 6
RMS Potential Alternative Routes.
- Appendix 8
Cross Section of possible lowered highway alignment at North Street.
- Appendix 9
BR1 Option - General Arrangement.
- Appendix 10
BR2 Option - General.
- Appendix 11
BR3 Option - General.
- Appendix 12
RMS Comparison of Options At North Street.
- Appendix 13
Revised Bypass Alignment.
Community updates and letters to the householder
- December 2011 community update
Berry bypass community meeting.
- December 2011 letter to the householder
Foxground and Berry bypass,Princes Highway upgradeHuntingdale Park Road Berry (south) interchange.
- December 2011 letter to the householder
Foxground and Berry bypass, Princes Highway upgrade Pole indicators for noise wall adjacent to North Street.
- November 2011 letter to the householder
North Street design workshops cancelled.
- September 2011 letter to the householder
Foxground and Berry bypass, Princes Highway upgrade Berry bypass preferred option review.
Berry Bridge and Northern interchange workshops
- November 2011 bridge design workshops process report
Roads and Maritime Services DRAFT report - bridge design and northern interchange workshops.
- November 2011 bridge design process report appendices
Roads and Maritime Services DRAFT report - bridge design and northern interchange workshops - appendices.
- November 2011 meeting statement
Meeting statement - design workshop 2.
- October 2011 meeting statement
Meeting statement - design workshop 1.
Community review group meeting notes and statements
- November 2011 meeting statement
Meeting statement 7.
- November 2011 meeting notes
Meeting Notes 7.
- November 2011 meeting statement
Meeting statement 6.
- November 2011 meeting notes
Meeting Notes 6.
- October 2011 meeting statement
Meeting Statement 5.
- October 2011 meeting notes
Meeting Notes 5.
- October 2011 meeting statement
Meeting Statement 4.
- October 2011 meeting notes
Meeting Notes 4.
- September 2011 meeting statement
Meeting Statement 3.
- September 2011 meeting statement
Meeting Statement 2.
- September 2011 meeting statement
Meeting Statement 1.
Presentations
- December 2011 Berry bypass community meeting presenation
Community meeting presentation showing the revised bypass alignment changes in comparison to the old design. Presentation also shows meeting objective, process of the review and next steps.
- November 2011 progress update presentation
Roads and Maritime Services process update at community review group meeting no 7, showing proposed revised alignment.
- November 2011 progress update presentation
RMS process update at community review group meeting No. 6.
- November 2011 progress update presentation
RMS presentation on progress update at community review group meeting no 6.
- November 2011 Urban design possible North Street alignments
RMS Urban design presentation on various alignments close to North Street including cross sections at community review group meeting no. 6.
- October 2011 Berry bridge and Berry North interchange workshop
Progress update for Berry bridge and North Berry interchange design development.
- October 2011 talking about North Berry precinct
Berry community review group - Talking about North Berry Precinct.
- October 2011 Berry bypass options review
Roads and Maritime Services (Formerly Roads and Traffic Authority) presentation at Berry committee review group meeting no. 4.
- September 2011 road traffic noise presentation
This presentation was given by community review group member (Acoustic engineer) Bob Fitzell to educate the group on road traffic noise.
Meeting register
- July 2013 meeting register
Foxground and Berry bypass meeting register.
Post-Construction operational road traffic noise assessment
- December 2018 post-construction operational road traffic noise assessment
This report provides the results of a road traffic noise assessment to determine whether road traffic noise levels from the project comply with relevant obligations in relational.
- December 2018 post-construction operational road traffic noise assessment appendices
Appendices.
- December 2018 email to stakeholders