Project documents - Windsor Bridge replacement
Project overview
View the documents relating to the Windsor Bridge replacement project.
Some documents on this page may not comply with accessibility requirements (WCAG).
If you are having trouble accessing information in these documents, please contact us.
Community information
Construction updates
- April 2021 construction update
- February and March 2021 construction update
- December 2020 - January 2021 construction update
- November 2020 construction update
- October 2020 construction update
- September 2020 construction update
- August 2020 construction update
- July 2020 construction update
- May - June 2020 construction update
- May 2020 construction update
- April 2020 construction update
- March 2020 construction update
- February 2020 construction update
- December 2019 to January 2020 construction update
- November 2019 contruction update
- October 2019 construction update
- 2018 2019 construction update
- August 2019 construction update
- July 2019 construction update
- June 2019 construction update
- March 2019 construction update
- November 2018 construction update
- November 2018 construction update
Project updates
- October 2019 project update
Windsor Bridge replacement project.
- August 2019 project update
Windsor Bridge replacement project.
- December 2016 project update
Windsor Bridge replacement project.
- August 2016 project update
Windsor Bridge replacement project.
- March 2016 project update
Windsor Bridge replacement project.
- May 2012 project update
Windsor Bridge replacement project.
Project notifications
- February 2022 project notification
Windsor Bridge replacement project – southern viewing platform maintenance work from Friday 11 February.
- February 2022 project notification
Windsor Bridge replacement project – southern viewing platform maintenance work from Friday 28 January.
- September 2021 project notification
Windsor Bridge replacement project – southern viewing platform maintenance work from Tuesday 5 October.
- July 2021 project notification
Thompson Square completed and now opened to the public.
- June 2021 project notification
Minor works are continuing on Bridge St, George St and Freemans Reach Road.
- March 2021 project notification
Continued work on Bridge Street, George Street, and Freemans Reach Road.
- February 2021 project notification
Continued work on Bridge Street, George Street, Macquarie Street, Wilberforce Road and Freemans Reach Road.
- January 2021 project notification
Continued night work on Bridge Street, George Street and Macquarie Street.
- December 2020 project notification
Night work on Bridge Street, George Street and Macquarie Street.
- May 2020 project notification
- April 2020 project notification
Project notification.
- March 2020 project notification
Construction update.
- April 2020 project notification
Construction update.
- March 2019 project notification
Temporary traffic changes from Monday 25 March 2019.
- September 2018 project notification
Line marking, from Monday 24 September 2018.
- September 2018 project notification
Major work starting on Windsor Bridge replacement from 24 September 2018.
- August 2018 project notification
Site compound setup for Windsor Bridge replacement project from Monday 20 August 2018.
- August 2018 project notification
Archaeological work on the Windsor Bridge replacement project from Thursday 16 August 2018.
- June 2018 project notification
Maritime archaeology work on Hawkesbury River, Windsor from Tuesday 3 July 2018.
- January 2018 project notification
Windsor Bridge Replacement Project – additional archaeological investigations.
- January 2018 project notification
Night work on Macquarie Street, Windsor from Monday 29 January 2018.
- December 2017 project notification
Windsor Bridge replacement salvage work continues.
- May 2016 project notification
Temporary site compound establishment from Monday 6 June 2016.
- April 2016 project notification
Enviornmental and heritage surveys and monitoring at Windsor Bridge and Thompson Square, Windsor from Monday 11 April 2016.
- April 2013 project notification
Inspections and survey work for the Windsor Bridge replacement project commencing 8 April 2013.
- April 2012 project notification
Archaeological and geotechnical investigations for the Windsor Bridge replacement project starting Monday 23 April 2012.
- June 2011 project notification
Windsor Bridge, Windsor - 40km/h truck and bus speed limit - commencing Tuesday 14 June 2011.
Community updates
- August 2021 community update
Windsor Bridge replacement project.
- April 2021 community update
Windsor Bridge replacement project.
- August 2020 community update
Windsor Bridge replacement project.
- April 2020 community update
Windsor Bridge replacement project.
March 2019 community update
Windsor Bridge replacement project.- May 2018 community update
Windsor Bridge replacement project.
- March 2018 community update
Windsor Bridge replacement project - Archaeological investigations.
- September 2017 community update
Windsor Bridge replacement project.
- March 2017 community update
Windsor Bridge replacement project – Urban Design and Landscape Plan.
- November 2012 community update
Windsor Bridge Replacement.
- August 2011 community update
Windsor Bridge over the Hawkesbury River.
- July 2009 community update
Windsor Bridge over the Hawkesbury River.
Frequently Asked Questions (FAQs)
- November 2020 frequently asked questions
Windsor Bridge replacement project.
- August 2020 bridge removal fact sheet
Windsor Bridge replacement project.
- February 2018 frequently asked questions
Windsor Bridge replacement project.
- February 2017 frequently asked questions
Windsor Bridge replacement project.
- December 2016 frequently asked questions
Windsor Bridge replacement project.
- April 2016 frequently asked questions
Windsor Bridge replacement project.
Reports
Windsor Bridge Heritage Interpretation Plan
Environmental Impact Statement (2012)
- December 2013 instrument of approval
Infrastrucutre approval signed.
- November 2012 environmental impact statement report
Executive Summary - volume 1.
- November 2012 environmental impact statement report
Chapter 1 - Introduction.
- November 2012 environmental impact statement report
Chapter 2 - Assessment process.
- November 2012 environmental impact statement report
Chapter 3 - Strategic justification and project need.
- November 2012 environmental impact statement report
Chapter 4 - Project development alternatives.
- November 2012 environmental impact statement report
Chapter 5 - Part 1 - Project description - Part 1.
- November 2012 environmental impact statement report
Chapter 5 - Part 2 - Project description - Part 2.
- November 2012 environmental impact statement report
Chapter 6 - Consultation.
- November 2012 environmental impact statement report
Chapter 7 - Part 1 - Assessment of key issues - State and local historic heritage and maritime heritage.
- November 2012 environmental impact statement report
Chapter 7 - Part 2 - Assessment of key issues - Aboriginal heritage.
- November 2012 environmental impact statement report
Chapter 7 - Part 3 - Assessment of key issues - Traffic and transport.
- November 2012 environmental impact statement report
Chapter 7 - Part 4 - Visual amenity, urban design and landscape.
- November 2012 environmental impact statement report
Chapter 7 - Part 5 - Assessment of key issues - Noise and vibration.
- November 2012 environmental impact statement report
Chapter 7 - Part 6 - Assessment of key issues - Soil, sediments, water and waste.
- November 2012 environmental impact statement report
Chapter 7 - Part 7 - Assessment of key issues - Hydrology.
- November 2012 environmental impact statement report
Chapter 7 - Part 8 - Assessment of key issues - Land use, property and socio-economic.
- November 2012 environmental impact statement report
Chapter 7 - Part 9 - Assessment of key issues - Flora and fauna.
- November 2012 environmental impact statement report
Chapter 7 - Part 10 - Assessment of key issues - Air quality.
- November 2012 environmental impact statement report
Chapter 8 - Assessment of other issues.
- November 2012 environmental impact statement report
Chapter 9 - Environmental risk analysis.
- November 2012 environmental impact statement report
Chapter 10 - Environmental management measures.
- November 2012 environmental impact statement report
Chapter 11 - Project justification and conclusion.
- November 2012 environmental impact statement report
Chapter 12 - References.
- November 2012 environmental impact statement report
Appendices A and B.
- November 2012 environmental impact statement report
Appendix C1 - Technical reports on the condition of existing Windsor Bridge.
- November 2012 environmental impact statement report
Appendix C2 - Bridge over Hawkesbury River at Windsor - Load Testing.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 1.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 2.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 3.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 4.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 5.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 6.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 7a.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 7b.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 7c.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 7d.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 8a.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 8b.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 8c.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 9a.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 9b.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 9c.
- November 2012 environmental impact statement report
Historic heritage working paper - Part 10.
- November 2012 environmental impact statement report
Maritime heritage working paper - Part 1.
- November 2012 environmental impact statement report
Maritime heritage working paper - Part 2.
- November 2012 environmental impact statement report
Maritime heritage working paper - Part 3.
- November 2012 environmental impact statement report
Maritime heritage working paper - Part 4.
- November 2012 environmental impact statement report
Maritime heritage working paper - Part 5.
- November 2012 environmental impact statement report
Maritime heritage working paper - Part 6.
- November 2012 environmental impact statement report
Aboriginal heritage working paper - Part 1.
- November 2012 environmental impact statement report
Aboriginal heritage working paper - Part 2.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 1.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 2.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 3.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 4.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 5.
November 2012 environmental impact statement report
Urban design and landscape working paper - Part 6.- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 7.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 8.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 9.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 10.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 11.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 12.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 13.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 14.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 15.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 16.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 17.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 18.
- November 2012 environmental impact statement report
Urban design and landscape working paper - Part 19.
- November 2012 environmental impact statement report
Working paper 4 - Traffic and transport - Part 1.
- November 2012 environmental impact statement report
Working paper 4 - Traffic and transport - Part 2.
- November 2012 environmental impact statement report
Working paper 4 - Traffic and transport - Part 3.
- November 2012 environmental impact statement report
Working paper 6 - Noise and vibration - Part 1.
- November 2012 environmental impact statement report
Working paper 6 - Noise and vibration - Part 2.
- November 2012 environmental impact statement report
Working paper 6 - Noise and vibration - Part 3.
- November 2012 environmental impact statement report
Working paper 6 - Noise and vibration - Part 4.
- November 2012 environmental impact statement report
Working paper 6 - Noise and vibration - Part 5.
- November 2012 environmental impact statement report
Working paper 7 - Soil, sediment, water and waste.
- November 2012 environmental impact statement report
Working paper 8 - Hydrology.
- November 2012 environmental impact statement report
Working paper 9 - Land use, property and socio-economic.
- November 2012 environmental impact statement report
Working paper 10 - Flora and fauna - Part 1.
- November 2012 environmental impact statement report
Working paper 10 - Flora and fauna - Part 2.
- November 2012 environmental impact statement report
Working paper 11 - Air quality.
- November 2012 environmental impact statement report
Thompson Square alternatives working paper.
Submissions report (2013)
- May 2013 submissions report
Windsor Bridge submissions PIR to CH 3.
- May 2013 submissions report
Windsor Bridge submissions PIR to CH 2.
- May 2013 submissions report
Windsor Bridge submissions PIR to CH 4.
- May 2013 submissions report
Windsor Bridge submissions PIR to CH 5.
- May 2013 submissions report
Windsor Bridge submissions PIR Appendix B.
- May 2013 submissions report
Windsor Bridge submissions PIR Appendix B Attachment 1.
- May 2013 submissions report
Windsor Bridge submissions PIR Appendix B Attachment 2.
- May 2013 submissions report
Windsor Bridge submissions PIR Appendix B Attachment 3.
- May 2013 submissions report
Windsor Bridge submissions PIR Appendix B Attachment 4.
- May 2013 submissions report
Windsor Bridge submissions PIR Appendix C.
- May 2013 submissions report
Windsor Bridge submissions PIR Appendix D.
- May 2013 submissions report
Windsor Bridge submissions PIR Appendix E.
- May 2013 submissions report
Windsor Bridge submissions PIR Appendix F - G.
Design modification
- February 2020 submission report
Windsor Bridge modification.
- September 2019 Environmental Assessment Modification
Windsor Bridge replacement project.
Approvals
- December 2021 Approval of Post-construction Dilapidation Report
- November 2020 Heritage Interpretation Plan Stage 2
- October 2020 Approval of out of hours roadwork
- October 2020 Approval letter - out of hours work - roadwork
- July 2020 Unexpected finds approval to resume work
- June 2020 Approval of Alternate Environmental Representative
- May 2020 Approval of the Archaeological Salvage Report - Aboriginal heritage
- May 2020 Out of hours work - traffic signals
- May 2020 Approval of Out of Hours Work Extension Request
- March 2020 Approval of Construction Heritage Management Plan Rev 2
- Signed approval from DPIE of the design and location of Flood Warning Signs
Design and location of Flood Warning Signs.
- Signed approval from DPIE of the operational noise mitigation measures
Operational noise mitigation measures.
- July 2019 compliance tracking program
Windsor Bridge.
- July 2019 Approval of Compliance Tracking Program
Windsor Bridge replacement project.
- May 2019 Approval of Addendum
Ancillary Facility Assessment: Condition C9.
- March 2019 Approval of revised Construction Traffic Management Plan (CTMP)
Construction Traffic Management Plan (CTMP).
- November 2018 replacement approval alternate heritage manager
- May 2018 Approval of Interpretation Plan (Stage 1)
- May 2016 Approval of the nominated Co-Excavation Directors
- March 2016 Approval of the proposed Archaeological Heritage Consultant team and Hawkesbury Region Sand Bodies Study
- May 2018 Approval of Maritime Salvage Works
- August 2018 Approval of the Sand Body Research Design
- September 2018 Approval compliance tracking program
- September 2018 Approval construction noise vibration sub-plan
- September 2018 Approval construction heritage management sub-plan
- September 2018 Approval CEMP, FFMP, SWMP,TMP
- September 2018 Approval community communications strategy
- August 2018 Approval ancillary facility assessment
- July 2018 Approval alternate heritage manager
- July 2018 Approval alternate environmental representative
- May 2018 Approval revised design condition B8
- May 2018 Approval Thompson Square conservation area interpretation plan
- May 2018 Approval heritage manager
- March 2018 Approval maritime salvage
- February 2018 Approval strategic consultation management plan
- February 2018 Approval of detailed archival recording
- December 2017 Approval detailed salvage strategy
- September 2017 Approval salvage works area 1
- August 2017 Approval water quality management program
- July 2016 Approval Aboriginal heritage investigation program
- June 2016 Approval non-Aboriginal heritage investigation program
- April 2016 Approval environment representative
- April 2016 Approval alternative environmental representative
- October 2016 Approval modify Aboriginal archaeology investigation program
- December 2013 Infrastructure Approval
Compliance Tracking reports
- August 2020 compliance tracking report
Compliance Tracking Report (January to June 2020).
- May 2020 Response to COVID-19
Windsor Bridge Replacement Project.
- February 2020 compliance tracking report
Compliance Tracking Report (July to December 2019).
- August 2019 compliance tracking report
Compliance Tracking Report (April to June 2019) Rev B.
- July 2019 compliance tracking report
Compliance Tracking Report (January to March 2019) Rev D.
- May 2019 compliance tracking report
Compliance Tracking Report (September to December 2018) Rev D.
Traffic and Option Modelling Report
- March 2018 traffic and options modelling report
Windsor Bridge Replacement Project.
Construction Environmental Management Plan
- August 2020 construction environmental management plan
Windsor Bridge Replacement Project (Rev. 2).
- December 2020 construction environmental management plan
Appendix B1: Construction Traffic Management Sub-Plan (Rev. 1).
- August 2020 construction environmental management plan
Appendix B2: Flora and Fauna Management Plan (Rev. 2).
- August 2020 construction environmental management plan
Appendix B3: Construction Noise and Vibration Management Plan (Rev. 2).
- August 2020 construction environmental management plan
Appendix B4: Soil and Water Management Plan (Rev. 2).
- August 2020 construction environmental management plan
Appendix B5: Construction Heritage Management Plan (Rev. 3).
- August 2020 construction environmental management plan
Appendix B6: Air Quality Management Plan (Rev. 2).
- August 2020 construction environmental management plan
Appendix B7: Waste Management Plan (Rev. 2).
- August 2020 construction environmental management plan
Appendix B8: Contaminated Land Management Plan (Rev. 2).
- August 2020 construction environmental management plan
Appendix B10: Acid Sulfate Materials Management Plan (Rev. 2).
Other reports
- December 2021 Construction Water Quality Monitoring Report - Year 3
- July 2021 Dilapidation Report
- March 2021 Former Windsor Bridge Demolition - Photographic archival recording
- November 2020 Construction Water Quality Monitoring Report - Year 2
- June 2020 Water Management Program Update
- July 2020 Archaeological Management Strategy – Barrel drain
- May 2020 Out of hours application – traffic signals
- May 2020 Out of Hours Work application – traffic switch
- February 2020 Construction Water Quality Monitoring Report – Year 1
Windsor Bridge Replacement Project. - December 2019 Windsor Bridge Rehabilitation Design of the Viewing Platform, Condition Assessment and Rehabilitation Options
Windsor Bridge Replacement Project.
- July 2019 compliance tracking program
Windsor Bridge Replacement Project.
- June 2019 Construction Water Quality Results for Potential PASS Influences
Windsor Bridge Replacement Project.
- February 2019 Windsor Bridge Mobile Plant trial
Vibration monitoring results.
- February 2019 WBRP – Ancillary Facilities Assessment Addendum Rev C
Windsor Bridge Replacement Project.
- February 2019 Compaction Roller Trial - Vibration Monitoring Results
Windsor Bridge Replacement Project.
- January 2019 Compaction Roller Trial - Vibration Monitoring Results
Windsor Bridge Replacement Project.
- January 2019 test piles vibration monitoring results - stage 1
Windsor Bridge Replacement Project.
- January 2019 test piles vibration monitoring results - stage 2
Windsor Bridge Replacement Project.
- June 2018 vegetation management plan
Windsor Bridge Replacement Project.
- October 2016 Historical and Maritime Archaeological Research Design
Windsor Bridge Replacement Project.
- September 2018 Ancillary Facility Assessment
Windsor Bridge Replacement Project.
- September 2018 community communication strategy summary
Windsor Bridge Replacement Project.
- May 2018 Thompson Square Drain Heritage Mitigation and Options Report
Windsor Bridge Replacement Project.
- May 2018 Interpretation Plan – Thompson Square Conservation Area
- March 2018 Maritime Archaeological Testing Report and Detailed Salvage Strategy for Maritime Archaeological Excavation
- February 2018 Thompson Square and Windsor Bridge - Detailed photographic archival recording
- September 2017 submissions report
- September 2017 Final Urban Design and Landscape Plan
- March 2017 Draft Urban Design and Landscape Plan
- October 2011 State Significant Infrastructure Application report
- October 2011 Community Issues Report
- August 2011 Windsor Bridge Options Report
- November 2009 Community Consultation Report
Technical reports
- January 2020 Aboriginal Archaeological Salvage Report
- Windsor Bridge Survey Data Comparison 2017 and 2019
- July 2019 Review of Operational Noise Mitigation Measures
- November 2017 Hydrological Mitigation Report
- January 2018 Water Quality Management Program
- April 2018 Design Compliance Report
- December 2017 Windsor Bridge Replacement Project Traffic Study
- November 2017 Sand Body Study
- November 2017 Detailed Salvage Strategy - Aboriginal and Historical
- August 2017 Location and design of Flood Warning Signs
- May 2017 Test Excavation Report - Aboriginal Heritage
- May 2017 Test Excavation Report - Aboriginal Heritage - Appendices
- May 2017 Historical Archaeological Testing report
- May 2017 Historical Archaeologial Testing report appendices
- August 2011 Government options review workshop report
- December 2017 Windsor Bridge Replacement Project Traffic Study
- August 2011 Built heritage and archaeological landscape investigations - sections 1-4
- August 2011 Built heritage and archaeological landscape investigations - sections 5-7
- August 2011 Built heritage and archaeological landscape investigations - appendix A part 1
- August 2011 Built heritage and archaeological landscape investigations - appendix A part 2
- August 2011 Built heritage and archaeological landscape investigations - appendix A part 3
- August 2011 Flora and fauna investigations
- August 2011 Hydraulic analysis
- August 2011 Landscape and visual investigation
- August 2011 Preliminary aboriginal archaeological and cultural heritage baseline investigations - sections 1-4
- August 2011 Preliminary aboriginal archaeological and cultural heritage baseline investigations - sections 5-9
- August 2011 Preliminary aboriginal archaeological and cultural heritage baseline investigations - appendices
- August 2011 Preliminary urban design and heritage review of options 1 and 3
- August 2011 Punt and whalf sites, maritime archaeological inspection
- August 2011 Socio-economic investigations
- August 2011 Traffic modelling and evaluation of options - preliminary report
- July 2011 Windsor Bridge Graphitisation Investigation
- June 2011 Bridge over the Hawkesbury River at Windsor Load Testing Report
- June 2011 Windsor Bridge U/W Bridge Follow up Inspection Report
- May 2011 Windsor Bridge U/W Bridge Inspection Report