Under the Transport Access Program, Transport for NSW has completed statewide accessibility upgrades and constructed new commuter car parks.

Transport for NSW (TAP) has completed accessibility upgrades and constructed new commuter car parks across the state, under the Transport Access Program.

Completed projects are listed below in alphabetical order by suburb/city/town.

Albion Park: Transport Interchange Upgrade 

Commenced November 2012
Completed April 2013

Key benefits

  • Redesigning and regrading of the ramp on the western side of the station to make it wheelchair compliant.
  • Pedestrian access to the western side bus stop on the Princes Highway.
  • More user friendly bicycle parking facility.
  • A designated 'Kiss and Ride' area for passenger pick up and drop off.

Allawah: Transport Interchange Upgrade

Commenced April 2010
Completed October 2011

 Key benefits

  • Improvements to bus stops, footpaths and ramps.
  • A designated new 'Kiss and Ride' area for passenger pick up and drop off.
  • New bicycle storage facilities, shelters and fencing.
  • Improved accessibility for the visually impaired with tactile indicators and new wayfinding signage on both sides of the station.

Armidale Station Upgrade

Commenced June 2020
Completed December 2020

Key benefits

  • Upgraded ramp at the station building entrance.
  • New ambulant toilets and a family accessible toilet.
  • Upgraded accessible car spaces and 'Kiss and Ride' area for passenger pick up and drop off.
  • A designated bus stop by the station entrance.
  • New station pathways, CCTV, lighting and wayfinding.

Arncliffe Pedestrian Link

Commenced May 2015
Completed October 2016

Key benefits

  • Improved pedestrian access to the long stay commuter car park located on the eastern side of Arncliffe Railway Station.
  • Refurbishment of the pavement to the commuter car park.
  • New signage for the designated ‘‘Kiss and Ride’ area for passenger pick up and drop off’ facility on Firth Street.
  • New lighting at the bus stops and taxi zones for customer safety and comfort.

Arncliffe Station Upgrade

Commenced April 2015
Completed August 2016

Key benefits

  • Four new lifts.
  • New canopies on the footbridge and platforms.
  • Upgraded CCTV security cameras and public announcement systems.
  • New sheltered bus stops, taxi rank and 'Kiss and Ride' area for passenger pick up and drop off along Firth Street.
  • New family accessible toilets at the platform level.
  • Two new accessible parking spaces within the existing car park off Burrows Street.
  • Upgraded stairs and wayfinding signage.
  • New bicycle rack storage facilities.

Artarmon Station Access Upgrade 

Commenced February 2015
Completed December 2015

Key benefits

  • Two new lifts.
  • A new pedestrian bridge to improve access from Hampden Road.
  • A new accessible parking space on Hampden Road.

Ashfield: Commuter Car Park

Commenced May 2017
Completed March 2018

Key benefits

  • Improvements to commuter parking by providing around 95 additional spaces on Brown Street.
  • New lifts.
  • Upgraded lighting and CCTV security cameras.
  • Improved wayfinding signage.
  • New bicycle storage facilities.

Asquith: New Commuter Car Park, Footpath and Lighting

Commenced February 2017
Completed August 2017

Key benefits

  • 42 parking spaces on Jersey Street North.
  • Two accessible parking spaces close to the station (within the Haldane Street Car Park).
  • A new walkway between the car park and the station.
  • New lights and CCTV security cameras.

Auburn: Transport Interchange Upgrade

Commenced April 2013
Completed September 2013

Key benefits

  • Upgrading the Northumberland Road ‘Kiss and Ride’ area for passenger pick up and drop off.
  • Facility to incorporate seating and signage.
  • removing the existing stairs that lead to the ramp at the railway station entrance and exit at South Parade.
  • A new weather wall at the South Parade bus stop.

Austinmer Station Access Upgrade

Commenced March 2013
Completed May 2013

Key benefits

  • The redesign and rebuilding of the ramp to platform 2.

Balmain East: Transport Interchange Upgrade

Commenced February 2016
Completed November 2016

Key benefits

  • A new accessible ramp and stairs.
  • Widened turning circle for better bus circulation.
  • Upgraded bus shelter, new landscaping and public seating.
  • New CCTV security cameras.

Banksia Station Upgrade

Commenced: September 2022
Completed: April 2022

Key benefits:

  • three new lifts to the station platforms
  • improvements to the existing underpass
  • new kiss and ride area and accessible parking space on Hattersley Street
  • upgrades to CCTV, lighting and wayfinding signage
  • modification of the existing station building on Platform 2 and 3 to provide unisex ambulant toilets and a family accessible toilet
  • regrading sections of the platforms
  • additional platform canopy coverage on platforms 2, 3 and 4.

Bankstown Station Upgrade

Commenced July 2014
Completed September 2015

Key benefits

  • New stairs and ramps to improve commuter circulation and customer flow at the northern and southern station entrances.
  • Relocation and installation of ticket barriers.
  • Installation of a covered walkway to the bus interchange.
  • Widening staircase access to platform.
  • Installation of bicycle storage facilities.

Baulkham Hills: New Commuter Car Park and Transport Interchange Upgrade

Commenced July 2014
Completed January 2015

Key benefits

  • A new commuter car park on the corner of Windsor Road and Torrs Street, Baulkham Hills.
  • 183 car spaces and 30 spaces for bicycle storage facilities.
  • New bus shelters on Windsor Road and Old Northern Road.
  • Improved lighting and footpaths.
  • 'Kiss and ride' facilities on Railway Street.

  • New pram ramps on Olive Street.

Beecroft Station Upgrade

Commenced September 2020
Completed December 2021

Key benefits

  • Two new lifts to provide access to the pedestrian subway and station platform.
  • A new platform canopy extending from the station building to the boarding assistance zone on platform 2.
  • Improvements to the family accessible toilet.
  • Upgraded accessible parking in the Sutherland Road Commuter Car Park.
  • New footpaths and wayfinding signage around the station precinct to improve accessibility.
  • Dedicated station services equipment room.
  • New CCTV security cameras and lighting to improve safety.
  • Landscaping works and relocation of impacted artworks.

Berala Station Upgrade

Commenced September 2016
Completed August 2017

Key benefits

  • A new lift.
  • Installation of a new canopy with 2 new train information display screens.
  • A family accessible toilet.
  • Undercover bicycle storage facilities.
  • Refurbished interchange areas including 'Kiss and Ride' area for passenger pick up and drop zones.
  • Station entry forecourt.
  • Two accessible parking spaces on Campbell Street.
  • New lighting, CCTV security cameras and wayfinding signage.

Berowra: New Commuter Car Park

Commenced March 2010
Completed December 2010

Key benefits

  • A new commuter car park.
  • 130 parking spaces.
  • Designated accessible parking.
  • New lighting and CCTV security cameras.
  • Free parking available 24 hours, 7 days a week.

Bexley North Station Upgrade 

Commenced May 2020
Completed October 2021

Key benefits

  • A new lift and station entrance.
  • New stairs and canopy.
  • Reconfigured and upgraded commuter car park including 2 new accessible parking spaces.
  • A new family accessible toilet and unisex ambulant toilet.

Birrong Station Upgrade

Commenced: July 2020

Completed: July 2021

Key benefits

  • A new lift.
  • New stairs.
  • Accessible parking.
  • Upgraded 'Kiss and ride' area for passenger pick up and drop area on Teresa Street.
  • New male and female ambulant toilets.
  • Refurbished family accessible toilet.

Blackheath Station Upgrade

Commenced May 2022
Completed July 2023

Key benefits 

  • Three new lifts to station entries and platforms.
  • Upgrades to the existing accessible parking spaces, kiss and ride bay and taxi zone.
  • Removal of the non-compliant pedestrian level crossing.   
  • Upgrades to station footpaths and platforms, including new tactiles and an accessible water fountain.  
  • Improvements to CCTV, lighting, and wayfinding.
  • Upgrades to the station footbridge, stairs, and provision of new bicycle hoops. 

Blacktown: New Commuter Car Park

Commenced May 2010
Completed July 2011

Key benefits

  • Multi-storey commuter car park along First Avenue.
  • 489 new commuter car park spaces.
  • 15 accessible spaces.
  • Eight motorcycle spaces.
  • 40 spaces for securing bicycles.
  • New lifts.
  • Security lighting and CCTV security cameras.
  • Parking is available 24 hours, 7 days a week.

Intersectional improvement

Opened May 2012

Key benefits

  • New dedicated right hand turn lane at the intersection of Third Avenue eastbound and Prince Street allowing for increased vehicle traffic entering the car park.

Blacktown Station Upgrade

Opened January 2018

Key benefits

  • A new footbridge connecting the Richmond Line concourse with the main concourse area.
  • New lifts and stairs connecting platform 3 with the new footbridge.
  • Stairs and weather protection canopies to Platforms 1 and 2.
  • Station facilities to improve commuter and customer flow.

Blaxland: New Station Canopy

Opened 2014

Key benefits

  • New steel canopies on the station platform to provide better protection for customers against rain and sun exposure.

Blayney Station Upgrade

Commenced June 2020
Completed December 2020

Key benefits

  • Upgrades to the ramp and doors at the station entrance.
  • A new accessible car space.
  • New ambulant toilets and a family accessible toilet.
  • Refurbished footpaths.
  • New CCTV security cameras, lighting and wayfinding signage.

Broadmeadow Station Upgrade

Opened June 2017

Key benefits

  • Improvements including new lifts, canopies on stairs and platforms, wayfinding signage, lighting upgrades and CCTV security cameras.

Byron Bay Interchange

Commenced May 2020
Completed April 2021

Key benefits

  • An accessible bus interchange with designated 'Kiss and Ride' area for passenger pick up and drop off and new taxi stand.
  • Three dedicated coach and bus bays.
  • An additional bay for shuttle and mini-bus services.
  • New and improved public seating.
  • A new amenities building with a family accessible toilet and ambulant toilet.
  • Allocated seating space for those with reduced mobility. 
  • An accessible parking space.
  • A pedestrian crossing linking the interchange with the town centre.
  • Landscaping using native species.

Campbelltown: Commuter Car Park Extension

Commenced July 2009
Completed December 2009

Key benefits

  • Upgrade of the existing car park on Farrow Road to add an additional 380 new car park spaces.

Campsie: Transport Interchange Upgrade

Commenced February 2013
Completed May 2013

Key benefits

  • New public seating at the eastbound bus stops on South Parade.
  • Bus stops on South Parade for customer safety and comfort.
  • Upgraded footpath at the 3 on-street commuter car parks.
  • New clear and direct wayfinding signage.
  • Accessible car parking spaces on North Parade.
  • New lighting upgrades.

Canley Vale: Station Access Upgrade and New Commuter Car Park

Station access 

Commenced November 2013
Completed May 2014

Key benefits

  • New accessible ramps on both sides of the station and new stairs and bike storage facilities on both sides of the station.
  • Extra CCTV security cameras.
  • New lighting.
  • Accessibility improvements indicators on the platform for the visually impaired with new handrails and tactile indicators.
  • New wayfinding signage.

Commuter Car Park

Commenced August 2014
Completed July 2015

Key benefits

  • The multi-storey car park, constructed on Fornasier Lane, Canley Vale offers 122 commuter parking spaces.
  • New lift and stair access.
  • Accessible parking spaces.
  • Upgraded lighting and CCTV security cameras.
  • The commuter car park also features 59 timed parking spaces for shoppers.
  • Commuter parking is available 24 hours, 7 days per week.

Canley Vale Station Upgrade 

Commenced November 2020  
Completed November 2021 

Key benefits

  • Two new lifts connecting the footbridge to the station platforms.

  • New accessible parking space and a 'Kiss and Ride' area on First Avenue.

  • Improved amenities including 1 family accessible toilet and a new male and a female ambulant toilet.  

  • Upgraded station entrance and widened footpath on Railway Parade.

  • Upgraded sections of the platforms.

  • Resurfacing of sections of the platforms.

  • New lighting, wayfinding signage and CCTV security cameras.

Cardiff: Station Upgrade

Commenced mid 2011
Completed April 2013

Key benefits

  • New lifts with 3 stops linking Council’s Mary Street car park with the station car park and the pedestrian footbridge.
  • Refurbishment of the ramp and footpath access from the footbridge to Main Road.
  • A new main station building with accessible paths, weather protection enclosures and upgraded ticket office.
  • New wheelchair and family accessible toilet.
  • Extension of the platform to fit eight-car trains on the platform.
  • Upgraded CCTV security cameras and lighting.

Caringbah: New Station Canopy

Completed 2014

Key benefits

  • New steel canopies installed on the station platform to provide better protection for customers against rain and sun exposure.

Clarendon: Station Access Upgrade

Commenced November 2013
Completed April 2014

Key benefits

  • Improvements to accessibility at Clarendon Station included the construction of a new accessible ramp and stairs.
  • Improved safety through the installation of additional CCTV security cameras and new lighting.

Como: New Station Canopy

Commenced June 2014
Completed February 2015

Key benefits

  • New steel canopies installed over the station platform to provide better protection for customers against rain and sun exposure.

Como Station Upgrade

Commenced August 2020
Completed November 2021 

Key benefits

Facilities include: 

  • 2 new lifts
  • upgraded station entry at the commuter car park
  • a designated 'Kiss and Ride' zone area for passenger pick and drop off zone
  • new accessible toilets and
  • improvements to CCTV and lighting. 

Croydon Station Upgrade

Completed October 2017

Key benefits

Accessibility improvements include:

  • new lifts and stairs
  • pedestrian footbridge
  • better shelter,
  • lighting and
  • CCTV security cameras.

Dapto: Transport Interchange Upgrade

Commenced August 2013
Completed December 2013

Key benefits 

  • Redesigning and rebuilding the ramp on the eastern side of the station to make it wheelchair accessible.
  • New wayfinding signage and more bus route and timetable information.
  • Upgraded seating in the taxi and bus zones.
  • Safety improvements to bus access road.
  • Lighting upgrades in and around the station, bus interchange and and taxi zone.
  • Refurbished footpaths around the station.

Dubbo Station Upgrade

Commenced August 2023
Completed March 2024

Key benefits 

  • Upgrades to existing paths and pavements around the station precinct.
  • A new accessible kiss and ride zone.
  • Modifications to the waiting room and ticket counter, including wheelchair spaces along the seating.
  • New tactile indicators along the platform.
  • Improvements to lighting and wayfinding.

Dungog Station Upgrade

Commenced July 2013
Completed November 2013

Key benefits

  • Construction of a new ramp.
  • New pedestrian walkway.
  • Upgrade of the existing ramp leading to the platform.

Edgecliff Station Upgrade 

Commenced February 2018
Completed July 2019

  • New facilities including lift access to the platform and bus interchange.
  • New 'Kiss and Ride' area for passenger pick up and drop off.
  • Public seating and shelter and improved bus interchange facilities.

East Hills Station Upgrade

Commenced June 2021
Completed April 2022

Key benefits

  • 2 new lifts connecting from the underpass to the station platforms
  • upgrade of the station entrance on Park Road to provide improved pathways for customers
  • upgrade of the two existing accessible parking spaces in the commuter car park
  • a new kiss and ride area on Park Road
  • upgrade of the pathway connecting Maclaurin Avenue to the station entrance
  • reconfiguration of the existing bathroom facilities to provide a new family accessible toilet, and a new female and male ambulant toilet
  • installation of hearing hoops and new boarding assistance zones on all platforms
  • improvements to lighting, CCTV and wayfinding signage.

Emu Plains: New Commuter Car Park

Commenced March 2010
Completed February 2011

  • Constructed on the northern side of Emu Plains Station with an entry from Lee Street.
  • 275 spaces and includes accessible parking spaces.
  • New security lighting.
  • CCTV security cameras.

Engadine: New Commuter Car Park, Footpath and Lighting 

Commenced January 2017 
Completed June 2017

Key benefits

  • A new commuter car park along the Princes Highway (southbound).
  • Upgrade of 2 accessible parking spaces within the existing car park near the station.
  • Refurbishment of stormwater  drainage, footpaths and fencing.
  • New and improved lighting.

Epping: Transport Interchange Upgrade

Completed July 2013

Key benefits

  • Upgrading the footpath on the western side of Beecroft Road (north of Epping Hotel).
  • Renewing road, pavement, kerb and guttering.
  • New bench seat at the existing bus stop on the western side of Beecroft Road.

Fairfield: Transport Interchange Upgrade

Commenced February 2013
Completed June 2014

Key benefits

  • Reconfiguring the bus interchange into the commuter car park previously at the intersection of The Crescent and Court Road.
  • Designated 'Kiss and Ride' area for passenger pick up and drop off on the westbound lane of The Crescent.
  • Relocating the taxi rank to the eastbound lane at the western end of The Crescent.
  • Relocating the signalised pedestrian crossing and creating a new zebra pedestrian crossing on The Crescent.
  • Streetscape upgrades on The Crescent and throughout the bus interchange.
  • New paving, street furniture, landscaping and wayfinding signage.
  • Extending the station forecourt to incorporate the historic crane previously located in the bus interchange.
  • New CCTV security cameras.

Fairy Meadow Station Upgrade

Commenced November 2019
Completed October 2020

Improvements include:

  • Two new lifts connecting platforms to footbridge.
  • New family accessible toilet on each platform.
  • New 'Kiss and Ride' area for passenger pick up and drop off.
  • Upgrades to footpaths from car park to station.
  • New CCTV security cameras and extra lighting.
  • New wayfinding signage and lighting.
  • Removal of the pedestrian track level crossing.

Faulconbridge Station Upgrade 

Commenced February 2020
Completed April 2021

Key benefits

  • Two new lifts to access the station platform and bus stop.
  • New unisex ambulant toilet and a family accessible toilet.
  • Upgrades to the pedestrian ramp connecting the commuter car park to the footbridge.
  • Modified accessible car space.
  • Improved 'Kiss and Ride' are for passenger pick up and drop off in the commuter car park.
  • Renew of station pathways, stairs and platform.
  • Additional CCTV security cameras and lighting.
  • New wayfinding signage.

Flemington Station Upgrade

Opened March 2017

Key benefits

Accessibility improvements include:

  • new lift access
  • ‘Kiss and Ride’ area for passenger pick up and drop off zone and new footbridge.

Gerringong: Station Upgrade

Commenced late 2012
Completed December 2012

Key benefits

  • Resurfacing and widening the existing external ramp providing public access to the platform. 
  • A new Disability Discrimination Act (DDA) compliant car parking space.

Glenbrook Station Upgrade

Commenced February 2019
Completed December 2019

Key benefits

  • A new lift to provide access to the footbridge.
  • New accessible 'Kiss and Ride' area for passenger pick up and drop off on Burfitt Parade.
  • New ambulant and family toilet.
  • Upgrades to CCTV security cameras and lighting.
  • New wayfinding signage.

Glenbrook: Commuter Car Park and Interchange Upgrade

Commenced September 2013
Completed March 2014

Key benefits

  • New commuter car park.
  • 56 extra car parking spaces.
  • Two accessible parking spaces close to the station entrance.
  • A safer pedestrian crossing and traffic island.
  • Improved footpaths.
  • Wayfinding signage and security fencing.
  • Safety improvements to the station entrance.
  • Installation of a new balustrade and non-slip paint to the ramp.
  • Lighting upgrade between the station entrance and the new car park.

Glenfield: New Commuter Car Parks

Multi-storey Commuter Car Park

Commenced October 2009
Completed September 2010

Key benefits

  • The multi-storey commuter car park is located north-east of the station with entry off Roy Watts Road.
  • 700 commuter parking spaces including accessible parking.
  • Lift access to all levels.
  • CCTV security cameras and safety lighting.
  • Free parking available 24 hours, 7 days a week.

The Glenfield Commuter Car Park was delivered as part of the South West Rail Link.

Seddon Park Commuter Car Park

Commenced May 2009
Completed October 2009

Key benefits

  • Update of the car park at Seddon Park with the entrance off Salisbury Avenue, Glenfield.
  • 117 new parking spaces for commuters using Glenfield Station.
  • Accessible parking and security lighting.

Gordon: New Commuter Car Parks and Interchange

Opened June 2015

Key benefits

  • The upgraded Werona Avenue Commuter Car Park provided over 130 commuter parking spaces.
  • On the western side of Gordon Station, off Henry Street, the new commuter car park and Interchange provides 214 commuter parking spaces, including 5 accessible parking spaces.
  • New bicycle storage facilities.
  • Motorcycle parking.
  • Bus stops.
  • Designated taxi zone.
  • Weather protected waiting areas.
  • New lighting and CCTV security cameras.

Gosford: New Commuter Car Parks

Commenced January 2015
Completed October 2015

Key benefits

  • Two new commuter car parks were constructed on Mann Street, Gosford, to provide 86 additional commuter parking spaces in close proximity to Gosford Station.

Goulburn Station Upgrade 

Commenced January 2021
Completed June 2021

Key benefits

  • Accessibility upgrades to the paths at the station entrance.
  • A new accessible 'Kiss and Ride' area for passenger pick up and drop off.
  • New kerb ramps to the existing bus and taxi zone.
  • Relocated accessible parking spaces to connect to the upgraded pathway to the station entrance
  • Upgrades to the waiting room and ticket counter on Platform 1.
  • New Boarding Assistance Zone and accessible help points on Platform 1.
  • Two new ambulant toilets.
  • improved lighting and new wayfinding signage.

Granville: New Commuter Car Parks and Transport Interchange Upgrade

Opened January 2015

Key benefits

  • A new commuter car park on the corner of Rowell and Cowper streets.
  •  20 additional commuter parking spaces in close proximity to Granville Station.
  • Upgrade of Granville bus interchange.
  • Another new commuter car park on Mary Street providing 40 additional commuter parking spaces. 
  • New public toilets, lighting and CCTV security cameras.
  • Refurbished footpaths and landscaping.

Greta: Station Upgrade

Completed March 2013

Key benefits

  • Redesigning and rebuilding of the existing ramps on both sides of the station and the entrances to improve customer access.

Harris Park Station Upgrade

Completed July 2018

Key benefits

  • New lift to access the platform.
  • New family accessible toilets.
  • Lighting upgrades and new CCTV security cameras to boost access and safety.

Hamilton Station Upgrade

Opened March 2013

Key benefits

  • Redesigning and rebuilding the existing ramp from the platform to the station entrance, off Beaumont Street.

Hawkesbury River Station Upgrade

Opened February 2020

Key benefits

  • Two new lifts to provide access to the station platforms.
  • A new accessible pathway and pedestrian crossing to the Dangar Road car park.
  • New accessible parking space and designated 'Kiss and Ride' area for passenger pick up and drop off.
  • New family accessible toilet.

Hazelbrook Station Upgrade

Commenced February 2019
Completed December 2019

Key benefits

  • New lift providing access to the station platforms.
  • Upgraded accessible pathways around the station entrance.
  • Two upgraded accessible parking spaces.
  • New family accessible toilet.
  • Upgrades to CCTV security cameras, lighting and wayfinding signage.

Heathcote Station Upgrade

Commenced July 2015
Completed December 2016

Key benefits

  • Designated ‘Kiss and Ride’ area for passenger pick up and drop off.
  • New bicycle storage facilities.
  • New lift, stairs and forecourt at Wilsons Parade.
  • Footbridge, new footpaths and a crossing for improved and safer access.
  • Upgrade of the commuter car parks.

Helensburgh: Commuter Car Park

Commenced April 2009
Completed September 2009

Key benefits

  • Commuter car park providing 70 new parking spaces on the southern side of the station.
  • New security lighting and CCTV security cameras.
  • Additional accessible parking spaces in the existing car park, closer to the station.

Holsworthy: Commuter Car Park Extension and New Commuter Car Park

Car Park Extension 

Commenced June 2015
Completed May 2016

Key benefits

  • Upgrade and expansion of the commuter car park at Holsworthy Station.
  • 462 additional commuter spaces.
  • 18 new motorcycle spaces.
  • Construction of additional parking levels on both of the existing multi-storey car parks.
  • A new lift.
  • Extension of an existing lift.
  • Installation of new lighting and CCTV security cameras to improve commuter safety.

Multi-deck Car Park 

Commenced March 2009
Completed December 2009

  • The new multi-deck car park constructed over the existing car park at Holsworthy provides 350 new parking spaces for commuters in South West Sydney.

Homebush Station Upgrade

Opened March 2018

Key benefits

  • Three new lifts to access station platforms.
  • Weather protection canopies.
  • Bicycle storage facilities.
  • A family accessible toilet.
  • Accessible parking spaces and 'Kiss and Ride' area for passenger pick up and drop off.
  • A new bus shelter.
  • Improved CCTV security cameras, lighting and wayfinding signage.

Huntleys Point: Transport Interchange Upgrade

Commenced September 2015
Completed June 2016

Key benefits include:

  • A new lift providing access to the wharf and a new accessible pathway from Huntleys Point Road to the new lift.
  • Relocation of 2 accessible parking spaces to provide a direct link to the new pathway and lift.
  • upgrade of the turning circle on Huntleys Point Road. 
  • A new accessible drop-off and pick-up area.
  • Upgraded lighting and CCTV security cameras.
  • Replacement of existing canopies from the waiting area to the new lift.
  • Installation of new canopies along the stairs adjacent to the new lift.

Ingleburn Station Upgrade

Opened September 2015

Key benefits

  • Three new lifts and covered walkways from the lifts to the platforms.
  • Reconfigured station entries and new customer amenities.
  • Upgrades to the bus stop and canopy.
  • Improved taxi zone.
  • New lighting and bicycle storage facilities.
  • Accessible parking.
  • Designated 'Kiss and Ride' area for passenger pick up and drop off.

Jannali Station Upgrade

Commenced late 2012
Completed April 2013

Key benefits

  • Redesigning and rebuilding the current ramp on the western side of the station.
  • Upgrading the footpath on the eastern side of the station.

Station Upgrade and Interchange Works

Commenced 2016
Completed 2017

Key benefits

  • Improvements have been made to provide easier access to public transport. 
  • New lifts, stairs and canopies.
  • A new family accessible toilet.
  • Bike storage facilities.
  • Improved lighting and CCTV security cameras.

Katoomba: New Commuter Car Park

Commenced November 2009
Completed July 2010

Key benefits

  • Located on the north east of the station at the corner of the Great Western Highway and Goldsmith Place.
  • 85 new parking spaces.
  • New security lighting and CCTV security cameras.
  • Three new accessible parking spaces have been provided on the southern side of the station.

Kiama: New Commuter Car Park

Commenced September 2013
Completed December 2013

Key benefits

  • The Kiama commuter car park was constructed on Bong Bong Road, behind Kiama Mowers, approximately 100 metres from Kiama Station.
  • 40 spaces including an accessible parking space, security lighting and CCTV security cameras.
  • Parking is available 24 hours, 7 days per week.

Killara: New Commuter Car Park

Completed May 2015

Key benefits

  • More than 80 new commuter car parking spaces.
  • Accessible parking spaces. 
  • A new accessible pedestrian ramp.
  • Improved lighting.
  • Line marking, bollards and wheel stops.
  • Landscaping improvements along the widened driveway entry.

Kingswood Station Upgrade

Commenced February 2019
Completed December 2019

Key benefits

  • Two new lifts to the concourse.
  • New accessible pathways throughout the station precinct.
  • Upgraded station entrances.
  • New accessible toilets.

Kingswood: Transport Interchange Upgrade and New Commuter Car Park

Transport Interchange Upgrade 

Commenced August 2011
Completed November 2011

Key benefits

  • New passenger drop off and pick up points, including '‘Kiss and Ride’ area and taxi zones.
  • Sheltered bicycle storage facilities on the northern side.
  • A shelter for passengers waiting in the ‘Kiss and Ride’ area and taxi zone.
  • Upgraded bus stops with tactile indicators for the visually impaired.
  • New wayfinding signage on Park Avenue for improved accessibility.
  • New footpath on the northern side of the station.
  • Pedestrian median safety fence on the Great Western Highway.
  • Updated signage on the southern side of the station.

Commuter Car Park

Completed April 2012

Improvements include:

  • Approximately 23 additional spaces.
  • A new entrance on the southern side of the Kingswood Station.
  • Improved traffic flow.
  • CCTV security cameras.
  • New lighting.
  • Covered footpath to the station.
  • A new designated '‘Kiss and Ride’ area for passenger pick up and drop off' and taxi zone.
  • Free parking available 24 hours, 7 days per week.

Kogarah: Transport Interchange Upgrade

Commenced June 2011
Completed April 2012

Key benefits

  • Redesign of the station forecourt.
  • Upgraded facilities on surrounding roads, including changes to bus stops, 'Kiss and Ride' area for passenger pick up and drop and taxi zones.
  • A new pedestrian crossing.
  • New bicycle storage facilities.

Lapstone Station Upgrade

Commenced February 2020
Completed April 2021

Key benefits

  • A new lift connecting the footbridge to Platform 2.
  • One new family accessible toilet, one new male ambulant toilet and one new female ambulant toilet.
  • Upgrades to the accessible car spaces.
  • Refurbishments of the ramp from the commuter car park to the pedestrian footbridge.
  • A new station entrance to Platform 1.
  • Accessibility upgrades to the platform waiting room.
  • Upgrades to station pathways, stairs and platforms.
  • New CCTV security cameras and lighting,
  • Wayfinding signage.

Leura Station Upgrade

Opened February 2018

Key benefits

  • A new lift and stairs.
  • Upgraded toilet facilities.
  • A designated 'Kiss and Ride' area for passenger pick up and drop off.
  • Formalised taxi rank with a direct accessible path to the station
  • Upgrades to lighting and CCTV security cameras.

Lisarow Station Upgrade 

Commenced September 2020 
Completed November 2021  

Key benefits 

  • Two new lifts connecting the platforms to the existing footbridge and commuter car parks,

  • A new accessible parking space and kiss and ride space in the Railway Crescent commuter car park.

  • A new 'Kiss and Ride' space for passenger pick up and drop off in the Pacific Highway commuter car park  

  • A new ramp to the southern station entry from the Pacific Highway pedestrian footpath.

  • Formalised Boarding Assistance Zones on each platform.

  • Upgraded CCTV security cameras and lighting for improved safety. 

Lithgow: New Station Canopy

Completed 2014

Key benefits

  • New steel canopies installed on the station platform to provide better protection for customers against rain and sun exposure.

Loftus: New Station Canopy

Completed 2014

Key benefits

  • New steel canopies were installed on the station platform to provide better protection for customers against rain and sun exposure.

Macarthur: New Commuter Car Park and Pedestrian Crossing

Commuter Car Park

Opened November 2011

Key benefits

  • Upgraded commuter car park.
  • 290 extra commuter parking spaces on the western side of the Tailby Street car park.
  • 160 spaces on the eastern side of the Tailby Street car park.
  • Free parking and available 24 hours, 7 days per week.

Pedestrian Crossing

Commenced October 2013
Completed December 2013

Key benefits

  • A signalised crossing on Menangle Road between Tailby Street and Geary Street to improve the connectivity between the commuter car park and the station.

Marayong: New Commuter Car Park, Footpaths and Lighting

Commenced November 2015
Completed June 2017

Key benefits

  • More than 100 new spaces along Railway Road and Harvey Road. 

Marrickville Station Upgrade

Commenced June 2016
Completed May 2017

Key benefits

  • Two new lifts.
  • A new staircase.
  • A new concourse.
  • 'Kiss and Ride' area for passenger pick up and drop off facilities.
  • Bicycle storage facilities.
  • Accessible parking.
  • A new taxi rank.
  • A new family accessible toilet.

Marulan Station Upgrade

Commenced December 2013
Completed April 2014

Key benefits

  • An accessible ramp and footpath from Platform 1 to the existing pedestrian level crossing.
  • An accessible ramp and footpath leading to Platform 2.
  • New balustrade and hand rails.
  • Improved safety including tactile surfacing, new lighting and CCTV security cameras.

Merrylands: Commuter Car Parks

Commenced December 2017
Completed August 2018

Key benefits

  • New commuter car parks at Merrylands Station by constructing 98 new spaces across two locations.

Millthorpe Station: Service Reinstatement

Commenced September 2018
Completed March 2019

Key benefits

  • The reinstatement of an on-demand service due to a platform extension providing a safe and accessible boarding point to trains.
  • New 15m long platform extension.
  • Additional lighting.
  • An information board.
  • New tactile indicators for the visually impaired.
  • A designated help point.
  • Installation of wooden picket fencing.
  • Platform extension, matching in with the surrounding fencing.

Milsons Point: Wharf Interchange Upgrade

Commenced February 2013
Completed April 2013

Key benefits

  • Designated 'Kiss and Ride' area for passenger pick up and drop off.
  • Regrading of footpath.
  • A new bus shelter.

Miranda: New Station Canopy

Completed 2014

Key benefits

  • New steel canopies installed on the station platform to provide better protection for customers against rain and sun exposure.

Mittagong: Station Upgrade

Commenced February 2014
Completed October 2014

Key benefits

  • A new accessible ramp to Platform 1.
  • New footpath and kerb ramp.
  • Designated 'Kiss and Ride’ area for passenger pick up and drop off and bus stop zones.
  • Upgrades to the existing accessible parking space.
  • New balustrade, fencing and hand rail to match existing building architecture.
  • New bike rack storage facilities for 8 bikes.
  • Improved safety features including tactile surfacing, lighting and CCTV surveillance cameras.

Mittagong Station Upgrade

Commenced January 2020
Completed September 2020

Key benefits

  • Two new lifts connecting platforms to footbridge.
  • New ambulant and family accessible toilet.
  • Upgrades to CCTV security cameras and lighting.
  • New formal bus stop and pedestrian crossing.
  • Two upgraded accessible parking spaces.
  • Designated 'Kiss and Ride' area for passenger pick up and drop off.
  • New wayfinding signage and tactile indicators for the visually impaired.

Moree Station Update

Commenced December 2021
Completed December 2022

Key benefits 

  • Upgrades to existing footpaths and ramps around the station precinct.
  • Upgrades to the taxi zone and kiss and ride space.
  • A new accessible parking space. 
  • A formalised bus stop at the station entrance.
  • Modifications to the waiting room and ticket office.
  • Improved amenities including ambulant toilets.
  • A new boarding zone on the platform.
  • Tactile indicators along the platform.
  • Improvements to wayfinding and lighting. 

Moss Vale: New Commuter Car Park

Commenced June 2013
Completed December 2013

Key benefits

The car park provides:

  • 56 commuter parking spaces.
  • New safety lighting and CCTV security cameras.
  • Two additional accessible parking spaces near the station entrance.
  • Improved lighting on Dalys Way.
  • A new pedestrian crossing to the car park on Dalys Way.
  • Upgraded bicycle storage facilities.

Mount Druitt: New Commuter Car Park

Commenced May 2009
Completed October 2012

Key benefits

  • The multi storey commuter car park located north-east of Mount Druitt Station on the corner of North Parade and Mount Street.
  • 220 additional car park spaces.
  • Maintenance works at the car park occurred between September and November 2018.

    Mulgrave Station Upgrade

    Commenced April 2014
    Completed April 2014

    Key benefits

    • Construction of a new accessible ramp.
    • Improved safety through the installation of additional CCTV security cameras and new lighting.

    Narara Station Upgrade 

    Commenced July 2020 
    Completed October 2021  

    Key benefits

    • Two new lifts connecting the platforms to the existing footbridge and commuter car parks.  

    • A new accessible parking space and 'Kiss and Ride' space for passenger pick up and drop off in both commuter car parks.  

    • A new pedestrian crossing across the northern commuter car park.

    • Relocation of the existing southbound bus stop on Narara Valley Drive.

    • Designated boarding assistance zones on each platform.

    • Upgraded CCTV security cameras and lighting for improved safety. 

    Narrabri Station Upgrade

    Commenced December 2021
    Completed December 2022

    Key benefits 

    • Removal of existing ramp to create an accessible path from the car park.
    • One accessible car space.
    • A formalised bus stop with a vehicle turning path.
    • Modifications to the waiting room.
    • A new family accessible toilet.
    • Upgraded platform seating.
    • A new boarding zone and tactile indicators on the platform.
    • Improvements to wayfinding and lighting.

    Narwee: Transport Interchange Upgrade

    Commenced March 2011
    Completed September 2011

    Key benefits

    • Upgrades to bus stops.
    • New 'Kiss and Ride' area for passenger pick up and drop off zone and taxi zone with shelters on Penshurst Road South.
    • Bicycle storage facilities.
    • Improvements to footpaths through the subway and on both sides of the station.

    Narwee Station Upgrade

    Opened December 2017

    Key benefits

    • A family accessible toilet
    • Lift access.
    • Improved customer information and wayfinding signage.
    • New stairs.
    • Upgrades to lighting and CCTV security cameras.

    Newtown Station Upgrade

    Commenced February 2011
    Completed February 2013

    Key benefits

    • A centrally located concourse.
    • New covered walkways.
    • A new lift.
    • Upgraded toilet and retail premises.
    • New platform canopies.
    • Improved CCTV security cameras and lighting.
    • New wayfinding signage and tactile indicators for the visually impaired.
    • Bicycle storage facilities.

    Niagara Park Station Accessibility Upgrade

    Commenced July 2020
    Completed August 2021

    Key benefits

    • Three new lifts connecting the platform and commuter car parks to the existing footbridge.
    • Five new bicycle hoops.
    • A new accessible parking space and 'Kiss and Ride' area for passenger pick up and drop off in both commuter car parks.
    • Permanent bus stop relocation closer to the local shopping centre on Washington Avenue.
    • A new accessible footpath extending from the station to the new bus stop location on Washington Avenue.  
    • A new pedestrian crossing across the Washington Avenue commuter car park connecting to the path to Niagara Park Shopping Centre.
    • Platform regrading.
    • Safety and security upgrades, including lighting, new CCTV security cameras and wayfinding signage.

    Normanhurst: Transport Interchange Upgrade

    Commenced March 2013
    Completed June 2013

    Key benefits

    • Upgraded road pavement and kerb and gutter at bus stops on Denman Parade.
    • Upgraded footpaths and existing pedestrian crossing on Denman Parade to improve pedestrian safety.
    • New bicycle storage facilities.

    North Strathfield Station Upgrade 

    Commenced February 2019
    Completed November 2019

    Key benefits

    • Three new lifts to access footbridge and station platforms.
    • Accessible on street parking and 'Kiss and Ride' area for passenger pick up and drop off on Queen Street.
    • Upgrades to station amenities with a family accessible toilet and ambulant toilet.
    • New CCTV security cameras and lighting.

    North Strathfield: Transport Interchange Upgrade

    Commenced August 2011
    Completed late 2012

    Key benefits

    • A new shelter over a pedestrian walkway.
    • New and designated 'Kiss and Ride' area for passenger pick up and drop off.
    • Bicycle storage facilities.
    • A new pedestrian access ramp.
    • Upgrade of footpaths.

    Oak Flats: New Commuter Car Park

    Commenced November 2013
    Completed June 2014

    Key benefits

    • Construction of an additional 230 parking spaces.
    • New lighting, landscaping and fencing.

    Oatley: Station Upgrade, New Footbridge and New Commuter Car Park

    Commenced January 2015
    Completed May 2017

    Key benefits

    • A new Commuter Car Park with 100 spaces.
    • New lift and stair access to Oatley Parade, Mulga Road and the station platforms.
    • New Station forecourts on both Oatley Parade and Mulga Road with landscaping to suit the current features.
    • A new pedestrian footbridge providing access from the new Oatley Parade and Mulga Road forecourts.
    • An accessible toilet on the station platform.
    • Interchange upgrades including reconfiguration of ‘Kiss and Ride’ area for passenger pick up and drop off.
    • Extra accessible parking.
    • New taxi and bus stops locations.
    • Extra bicycle storage facilities.
    • New lighting and CCTV security cameras.
    • New wayfinding signage.

    Ourimbah: Accessibility Upgrade

    2013 upgrade:

    Commenced June 2013
    Completed September 2013

    Key benefits

    • Two small ramps at the station building doorways on Platform 2.
    • New handrails and tactile indicators for the visually impaired.

    2021 upgrade:

    Commenced July 2020
    Completed August 2021

    Key benefits

    • Two new lifts connecting the existing footbridge to the platforms.
    • A new station entrance from the Pacific Highway.
    • A new access ramp from the Shirley Street commuter car park to Platform 1.
    • A new undercover waiting area on Platform 1.
    • Improvements to existing waiting rooms to provide equitable access.
    • Platform resurfacing.
    • Installation of hearing loops.
    • Upgrades to lighting and CCTV security cameras and safety.

    Padstow: New Commuter Car Park

    Commenced July 2014
    Completed May 2015

    Key benefits

    • 100 additional commuter parking spaces
    • New lift and stair access
    • Motorcycle parking spaces
    • Bicycle storage facilities.
    • New lighting and CCTV security cameras.
    • Short-term parking and family accessible toilets at the car park site managed by Bankstown City Council.

    Panania: Transport Interchange Upgrade

    Completed October 2011

    Key benefits

    • Upgrades to bus stops and footpaths.
    • Designated 'Kiss and Ride' area for passenger drop off zones and a taxi zone on the north side of the station.
    • Bicycle storage facilities.
    • New shelters and fencing.
    • Tactile indicator guides for the visually impaired and wayfinding signage to improve accessibility.

    Panania Station Upgrade

    Commenced September 2017
    Completed July 2018 

    Key benefits

    • Three new lifts and stairs to the platforms.
    • New ramps.
    • Bicycle storage facilities.
    • A new family accessible toilet.
    • Upgrades to CCTV security cameras and lighting.
    • New wayfinding signage.

    Parkes Station Upgrade

    Commenced June 2020
    Completed April 2021

    Key benefits

    • Upgrading the existing footpath.
    • New ambulant toilets and a family accessible toilet.
    • Upgrading the existing accessible car spaces and 'Kiss and Ride' area for passenger pick up and drop off.
    • A designated bus stop by the station entrance.
    • Upgraded station pathways.
    • New CCTV security cameras and lighting.
    • Extra wayfinding signage.

    Pendle Hill Station Upgrade

    Commenced July 2017
    Completed December 2017 

    Key benefits

    • Four new lifts.
    • A family accessible toilet.
    • A new station concourse and footbridge.
    • Upgraded stairs and platform canopies.
    • New commuter car park with around 125 additional spaces.

    Pennant Hills: Transport Interchange Upgrade

    Commenced April 2013
    Completed July 2013

    Key benefits

    • Upgrading uneven footpath areas at Railway Street, Yarrara Road and Ramsay Road.
    • Reconstructing uneven road pavement in Railway Street and at the intersection of Ramsay Road and Pennicook Lane.
    • Converting the existing RailCorp staff car park for commuter use, including an upgrade to comply with accessibility standards.
    • Five car spaces have been made available for customers, including 2 accessible parking spaces.
    • New signage for the designated 'Kiss and Ride' area for passenger pick up and drop off on Yarrara Road and Ramsay Road.

    Penrith Commuter Car Park

    Completed August 2017

    Key benefits

    • 430 additional commuter parking spaces.
    • A new lift and stairs.
    • Upgraded lighting and CCTV security cameras.

    Penrith Station Upgrade

    Opened November 2017

    Key benefits

    • New stairs and canopies.
    • A new station concourse.
    • Accessible amenities. 
    • Upgraded interchange area.

    Petersham Station Upgrade

    Commenced June 2020
    Completed September 2021

    Key benefits

    • Two new lifts connecting the existing footbridge to the Terminus Street entrance and the station platform.
    • A new access ramp and stairs from the Trafalgar Street station entrance to the existing footbridge.
    • Upgrade work to the existing footbridge and stairs.
    • A new accessible parking space adjacent to the Terminus Street lift.
    • A designated 'Kiss and Ride' area for passenger pick up and drop off on Terminus Street.
    • New bicycle parking on both sides of the station.
    • New male and female ambulant toilet. 
    • A new family accessible toilet.
    • Upgraded CCTV security cameras and lighting.

    Picton: Transport Interchange Upgrade

    Commenced September 2013
    Completed December 2013

    Key benefits

    • Upgrading the footpath pavement on the northern side of Station Street.
    • A new refuge island on Station Street and a new pedestrian footpath for the southern side of Station Street.
    • A pedestrian safety fence along the northern side of the Prince Street road bridge (over the railway line).
    • New wayfinding signage.

    Point Clare: Station Upgrade 

    Commenced September 2021
    Completed November 2022 

    Key benefits

    • 2 new lifts connecting each platform to the commuter car parks 
    • new ramp from Kurrawa Avenue Commuter Car Park to connect to the new lift 
    • new stairs from Kurrawa Avenue entry to the station underpass 
    • 2 new accessible parking spaces and 1 kiss and ride space in Brisbane Water Drive Commuter Car Park 
    • 1 new accessible parking space and 1 kiss and ride space in Kurrawa Avenue Commuter Car Park 
    • upgraded pathways around the station precinct 
    • upgrade to the existing toilets to provide a new family accessible toilet and a new unisex ambulant toilet 
    • minor platform regrading and installation of new platform edge tactiles, where required 
    • reconfigured bicycle parking on Brisbane Water Drive 
    • improvements to lighting, electricity supply, wayfinding and security camera system (CCTV). 

    Prairiewood: Commuter Car Park 

    Commenced December 2018
    Completed July 2019 

    Key benefits

    • Provision of 85 car parking spaces near the Liverpool-Parramatta T-Way.

    Redfern: Access Upgrade

    Commenced April 2015
    Completed November 2015

    Key benefits

    • A new lift to Platforms 6 and 7.
    • A new section of canopy providing sheltered access to the lift.
    • New CCTV security cameras, lighting and fencing around the lift area.

    Revesby: New Commuter Car Park

    Commenced March 2010
    Completed April 2011

    • 720 spaces, with approximately 580 spaces allocated for commuters and the remainder for shoppers.
    • 15 accessible parking spaces.
    • Lift access to all levels.
    • Accessible pathways.
    • New security lighting and CCTV security cameras.
    • Parking is available 24 hours, 7 days per week.

    Riverstone Station Upgrade

    Commenced November 2013
    Completed April 2014

    Key benefits

    • Re-grading the internal ramp near the ticket office.
    • Construction of a new ramp between the platform and Garfield Road.

    Rockdale: Commuter Car Park Extension

    Commenced November 2013
    Completed September 2014

    Key benefits

    • An additional 24 parking spaces.
    • Three new accessible parking spaces.
    • Two existing accessible parking spaces.
    • Free parking available 24 hours, 7 days per week.

    Roseville Station Upgrade 

    Opened November 2021 

    Key benefits

    • Existing footbridge upgraded including new screens and handrails.

    • Two new lifts providing access between Hill Street, the existing footbridge and the station platform.

    • Accessible pathways to the station to provide access between the Pacific Highway and the existing footbridge.

    • Canopies at the Hill Street station entrance and the platform boarding assistance zone.

    • An interchange zone including accessible parking, taxi zone and 'Kiss and Ride bay for passenger pick up and drop off bay.

    • New bus shelter.

    • Increased bike parking on Hill Street and Pacific Highway.

    • Refurbished amenities including a male and female ambulant toilet and family accessible toilet 

    • New CCTV security cameras and lighting.

    Rooty Hill Station Upgrade and Commuter Car Park 

    Commenced May 2018
    Completed February 2020

    Key benefits

    • New footbridge.
    • Four lifts.
    • New stairs.
    • Larger platform canopies.
    • Upgrades to family accessible toilets on each platform.
    • New CCTV security cameras and improved lighting.
    • A new multi-story commuter car park.

    Scone Station Upgrade

    Commenced March 2013
    Completed May 2013

    Key benefits

    • Resurfacing and re-leveling of the footpath.
    • Line-marking the accessible car parking space.

    Shellharbour Junction: Station and Interchange Upgrade 

    Opened November 2014

    Key benefits

    • Upgrade of station.
    • Interchange is located at the end of Piper Drive, off Dunmore Road.

    Singleton Station Upgrade

    Commenced late 2012
    Completed February 2013

    Key benefits

    • Improved ramp access.

    Springwood: New Station Canopy

    Opened May 2015

    Key benefits

    • New steel canopies installed on the station platform to provide better protection for customers against rain and sun exposure.

    Strathfield Station Upgrade

    Commenced October 2013
    Completed January 2014

    Key benefits

    • Station refurbishment after the removal of retail kiosks.
    • Relocation of Public Information Displays (PIDs).
    • New handrail around the central columns.
    • Upgraded lighting.
    • New tiling where the kiosks were removed.

    Sutherland: Transport Interchange Upgrade, Access Upgrade, New Commuter Car Park

    Transport Interchange Upgrade

    Commenced late 2012
    Completed May 2014

    Key benefits

    • The Sutherland Interchange Upgrade provides increased bus capacity, alleviates some existing traffic congestion and provides a safer environment for pedestrians around Sutherland Station.

    Access Upgrade 

    Commenced April 2014
    Completed October 2014 

    Key benefits

    • A new lift linking the concourse and Platform 1.
    • New stairs and canopies.
    • An extension to the station concourse.
    • A new ticket office.

    Commuter Car Park

    Commenced August 2014
    Completed July 2015

    Key benefits

    • 388 commuter parking spaces
    • New lift and stair access.
    • Accessible parking spaces.
    • Upgraded lighting and CCTV security cameras.
    • 84 spaces for use of members of Club on East (formerly Sutherland United Services Club).
    • Free parking in the upper 4 levels available 24 hours, 7 days per week.

    Sydney CBD: Martin Place Station Upgrade

    Opened April 2011

    Key benefits:

    • A new lift from Martin Place street level to the station concourse as part of the Easy Access Upgrade.

    Sydney CBD: Museum Station Upgrade

    Commenced May 2015
    Completed November 2016

    Key benefits:

    • A new lift connecting the entry of the station on the corner of Elizabeth and Liverpool streets and the underground station concourse.
    • Two new lifts connecting the station concourse with the platforms.
    • An accessible ramp at the station entrance.
    • A new family accessible toilet.
    • Refurbishment of the toilets within the concourse.

    Sydney CBD: St James Station Upgrade

    Opened April 2011

    Key benefits

    •    Accessibility improvements including a new lift from street level to concourse level tunnel.

    Sydenham Station Upgrade

    Commenced January 2011
    Completed February 2013

    Key benefits

    • A new elevated concourse and station entrance with new ticketing facilities, retail space, a staff office and public and family accessible toilets.
    • Four new lifts to the platform and concourse.
    • Expansion of the station forecourt area to include new bicycle storage facilities and new staircases to access platforms.

    Tahmoor Station Upgrade

    Commenced May 2015
    Completed October 2015

    Key benefits

    • Construction of new accessible ramps to both platforms.
    • New accessible parking spaces.
    • Upgraded safety features including lighting and CCTV security cameras.

    Thirroul: New Commuter Car Park 

    Commenced May 2015
    Completed September 2015

    Key benefits

    • A new commuter car park was constructed on Church Street.
    • 151 commuter parking spaces near Thirroul Station.
    • New security lighting and CCTV security cameras.

    Toongabbie Station Upgrade

    Commenced May 2017
    Completed May 2018

    Improvements include:

    • New lifts, stairs and canopies.
    • Upgrades to bicycle storage facilities.
    • Refurbished interchange areas.
    • New wayfinding signage.
    • Two new family accessible toilets.
    • Improved lighting and CCTV security cameras.

    Unanderra: Station Upgrade

    Opened March 2013

    Key benefits

    • Remediation of the existing station platform.
    • Upgrading CCTV security cameras and lighting.
    • Draining and maintenance to the existing pedestrian footbridge.

    Victoria Street Station Upgrade

    Commenced October 2017
    Completed March 2018

    Key benefits

    • Three new lifts and canopies.
    • A family accessible toilet.
    • Accessible parking and taxi bays on both sides of the station.
    • Upgrades to footpaths.
    • New lighting and CCTV security cameras.

    Wallarobba Station Upgrade

    Commenced December 2013
    Completed April 2014

    Key benefits

    • A new accessible ramp.
    • An accessible parking space with footpath leading to the ramp.
    • Upgrades to safety features including lighting and CCTV security cameras.

    Waratah Station Upgrade 

    Commenced May 2019
    Completed August 2020

    key benefits

    • Three new lifts connecting the footbridge.
    • New accessible pathways throughout the station precinct.
    • A new accessible parking space on Platt Street.
    • A new family accessible toilet and unisex ambulant toilet.
    • Upgrades to the 'Kiss and Ride' and taxi zones.
    • New CCTV security cameras and lighting.

    Warrawee Station Upgrade 

    Commenced November 2019
    Completed September 2020

    Key benefits

    • A new lift connecting the footbridge to the platforms.
    • Accessible pathways throughout the station precinct.
    • New 'Kiss and Ride' spaces for passenger pick up and drop off.
    • Accessible parking.
    • A new bicycle shelter and storage facilities.
    • A family accessible toilet and ambulant toilet.

    Waterfall Station Upgrade

    Commenced March 2014
    Completed July 2015

    Improvements include:

    • A new concourse with level access to the Kooraban Street overbridge.
    • A new lift from the concourse to the station platform.
    • Raised station platform level.
    • Weather protection canopies on the station platform.
    • Resurfaced Kooraban Street overbridge footpath.
    • Accessible toilets on the station platform level.
    • New 'Kiss and Ride' for passenger pick up and drop off.
    • Upgraded bicycle storage facilities.

    Wauchope Station Upgrade

    Commenced June 2020
    Completed March 2021

    Key benefits

    • Upgrades to ramp at the station building entrance.
    • New ambulant toilets and a family accessible toilet.
    • Refurbished accessible car spaces.
    • 'Kiss and Ride' area for passenger pick up and drop off.
    • A formalised bus stop by the station entrance.
    • Upgrades to station pathways.
    • New CCTV security cameras and lighting.
    • Wayfinding signage.

    Windsor Station Upgrade

    Commenced October 2011
    Completed 2012

    Key benefits

    • A new station building.
    • Reconfiguration and refurbishment of the existing station building.
    • Reconstruction of the platform.
    • Replacement of awnings.
    • Upgrade of the public address system, CCTV security cameras and new lighting systems.

    Wentworth Falls Station Upgrade

    Commenced June 2017
    Completed December 2017

    Key benefits

    • Three new lifts.
    • Weather protection canopies.
    • Accessible toilets.
    • New 'Kiss and Ride' area for passenger pick up and drop off.

    Wentworthville Station Upgrade

    Commenced November 2017
    Completed October 2019

    Key benefits

    • Three new lifts.
    • Weather protection canopies.
    • Accessible toilets.
    • New waiting areas.
    • Extra bicycle storage facilities.
    • Designated 'Kiss and Ride' area for passenger pick up and drop off.

    Wollstonecraft Station Upgrade

    Commenced October 2020
    Completed May 2022

    Improvements include:

    • two new lifts connecting to the station platforms
    • new station entry ramps from Shirley Road and Telopea Street to provide accessible paths to the lifts
    • platform raising work to bring platforms level with train carriages 
    • a covered boarding assistance zone on Platform 1
    • a new accessible parking space on Shirley Road
    • improved amenities such as a new male and female ambulant toilet and a new family accessible toilet
    • improved CCTV and lighting. 

    Woy Woy: New Commuter Car Park

    Commenced April 2010
    Completed April 2011

    Key benefits

    • Three levels of parking with approximately 300 additional spaces, including 17 accessible spaces.
    • New lighting, and CCTV security cameras.

    Wyee Station Upgrade 

    Commenced May 2019
    Completed August 2020

    Key benefits

    • Three new lifts connecting footbridge with platforms.
    • Accessible pathways throughout the station precinct.
    • A new accessible parking space.
    • A family accessible toilet and unisex ambulant toilet.
    • Upgrades to 'Kiss and Ride' area for passenger pick up and drop off.
    • New CCTV security cameras and lighting.

    Yagoona Station Upgrade 

    Commenced July 2021
    Completed July 2022

    Key benefits

    • A new entry concourse, building, stairs and lift.
    • A new family accessible toilet and new male and female ambulant toilets.
    • Additional platform canopies.
    • Two new accessible parking spaces and upgrades to the 2 existing ones.
    • A new ‘Kiss and Ride’ bay.
    • Platform regrading and new tactile installation.
    • Upgrades to lighting and CCTV.

    Yass Junction: Station Upgrade

    Commenced May 2015
    Completed October 2015

    Key benefits

    • A new accessible ramp to platform 2 and the ticket office.
    • Extra parking spaces.
    • Improved safety features including new lighting.