Under the Transport Access Program, Transport for NSW has completed statewide accessibility upgrades and constructed new commuter car parks.

Transport for NSW has completed accessibility upgrades and constructed new commuter car parks across the state, under the Transport Access Program.

Albion Park: Transport Interchange Upgrade 

Commenced November 2012
Completed April 2013

Improvements included:

  • Redesigning and regrading of the ramp on the western side of the station to make it wheelchair compliant
  • Improving pedestrian access to the western side bus stop on the Princes Highway
  • Providing a more user friendly bicycle parking facility
  • Providing a formalised ‘kiss and ride’ area for passenger pick up and drop off.

Allawah: Transport Interchange Upgrade

Commenced April 2010
Completed October 2011

 Improvements included:

  • Changes to bus stops, footpaths and ramps
  • A new 'kiss and ride' pedestrian drop-off zone
  • Bicycle racks, shelters and fencing
  • Guides for the visually impaired and signage on both sides of the station to improve accessibility.

Arncliffe: Pedestrian Link

Commenced May 2015
Completed October 2016

Improvements included:

  • Improving lighting for customer safety and comfort at the bus stops and taxi zones
  • Improving pedestrian access to the long stay commuter car park located on the eastern side of Arncliffe Railway Station
  • Maintaining the pavement to the long stay commuter car park located on the eastern side of Arncliffe Railway Station
  • Providing signage to formalise the ‘kiss and ride’ facility on Firth Street.

Arncliffe: Station Upgrade

Commenced April 2015
Completed August 2016

Improvements included:

  • Four new lifts
  • New canopies on the footbridge and platforms, upgraded CCTV surveillance cameras and announcement systems
  • New sheltered bus stops, taxi rank and kiss and ride area along Firth Street and  new family accessible toilets at the platform level
  • Two new accessible parking spaces within the existing car park off Burrows Street, upgraded stairs and wayfinding signage, and new bicycle racks.

Artarmon: Station Access Upgrade 

Commenced February 2015
Completed December 2015

Improvements included:

  • Two new lifts
  • A new pedestrian bridge to improve access from Hampden Road
  • A new accessible parking space on Hampden Road.

Ashfield: Commuter Car Park

Commenced May 2017
Completed March 2018

Construction is now complete to improve commuter parking by providing around 95 additional spaces on Brown Street. The car park features lifts, new lighting and CCTV cameras, wayfinding signage and bicycle storage facilities.

Asquith: New Commuter Car Park, Footpath and Lighting

Commenced February 2017
Completed August 2017

Improvements included:

  • 42 parking spaces on Jersey Street North
  • 2 accessible parking spaces close to the station (within the Haldane Street Car Park)
  • A new walkway between the car park and the station plus new lights and CCTV cameras

Auburn: Transport Interchange Upgrade

Commenced April 2013
Completed September 2013

Improvements included:

  • Upgrading the Northumberland Road ‘kiss and ride’ facility to incorporate seating and signage
  • Removing the existing stairs that lead to the ramp at the Railway Station entrance and exit at South Parade
  • A new weather wall at the South Parade bus stop.

Austinmer: Station Access Upgrade

Commenced March 2013
Completed May 2013

Improvements included:

  • Redesigning and rebuilding the ramp to platform 2.

Balmain East: Transport Interchange Upgrade

Commenced February 2016
Completed November 2016

Improvements included:

  • A new accessible ramp and stairs
  • Widened turning circle for better bus circulation
  • Improved bus shelter, new landscaping and seating
  • Provision of CCTV cameras.

Bankstown: Station Upgrade

Commenced July 2014
Completed September 2015

Improvements included:

  • New stairs and ramps to improve circulation at the northern and southern station entrances
  • Relocation and installation of ticket barriers
  • Installation of a covered walkway to the bus interchange
  • Widening staircase access to platform, and installation of bicycle parking facilities.

Baulkham Hills: New Commuter Car Park and Transport Interchange Upgrade

Commenced July 2014
Completed January 2015

Improvements included:

  • A new commuter car park on the corner of Windsor Road and Torrs Street, Baulkham Hills providing 183 car spaces and a 30 space bicycle rack.
  • New bus shelters on Windsor Road and Old Northern Road

    Improved lighting and footpaths

  • Kiss and ride facilities on Railway Street and new pram ramps on Olive Street.

Berala: Station Upgrade

Commenced September 2016
Completed August 2017

Improvements included:

  • A new lift, a new canopy with two new train information display screens, and a family accessible toilet
  • Undercover bicycle racks
  • Improved interchange areas, including kiss and ride zones, upgraded station entry forecourt and two accessible parking spaces on Campbell Street
  • Upgrades to lighting and CCTV surveillance, and improved wayfinding signage.

Berowra: New Commuter Car Park

Commenced March 2010
Completed December 2010

Improvements included:

  • A new commuter car park providing 130 spaces and accessible parking which is free and available 24 hours, seven days per week.
  • Security lighting and CCTV surveillance. 

Blacktown: New Commuter Car Park

Commenced May 2010
Completed July 2011

The project included:

  • A multi-storey commuter car park along First Avenue, providing 489 new commuter car park spaces, 15 accessible spaces, eight motorcycle spaces and 40 spaces for securing bicycles. The car park also includes lifts, security lighting and CCTV surveillance. Parking is free and available 24 hours, seven days a week.
  • The final stage of the Blacktown Commuter Car Park project was completed in May 2012 and involved the creation of a dedicated right hand turn lane at the intersection of Third Avenue eastbound and Prince Street. The new right hand turn lane allows for increased vehicle traffic entering the car park.

Blacktown Station Upgrade

Opened January 2018

The project included a new footbridge connecting the Richmond Line concourse with the main concourse area, lifts and stairs connecting Platform 3 with the new footbridge, stairs and weather protection canopies to Platforms 1 and 2, and changes to station facilities to improve customer flow.

Blaxland: New Station Canopy

Completed 2014

  • New steel canopies were installed on the station platform to provide better protection for customers against rain and sun exposure.

Broadmeadow Station Upgrade

Completed June 2017

Improvements have been made to provide easier access to public transport, including new lifts, canopies, wayfinding signage, lighting and CCTV camera surveillance.

Campbelltown: Commuter Car Park Extension

Commenced July 2009
Completed December 2009

  • The Campbelltown Commuter Car Park project involved an extension of the existing car park on Farrow Road to create an additional 380 new car park spaces.

Campsie: Transport Interchange Upgrade

Commenced February 2013
Completed May 2013

Improvements included:

  • Seating at the eastbound bus stops on South Parade
  • Improving bus stops on South Parade for customer safety and comfort
  • Improving footpath pavements on route to and at the three on-street commuter car parks, and installing clear and direct way-finding signage
  • Installing disabled car parking spaces on North Parade, including lighting upgrades.

Canley Vale: Station Access Upgrade and New Commuter Car Park

Station Access 

Commenced November 2013
Completed May 2014

Improvements included:

  • New accessible ramps on both sides of the station and new stairs and bike racks on both sides of the station
  • Additional CCTV surveillance cameras and lighting, new tactiles on the platform, new handrails and signage.

Commuter Car Park

Commenced August 2014
Completed July 2015

  • The multi-storey car park, constructed on Fornasier Lane, Canley Vale, provides a total of 122 commuter parking spaces, lift and stair access, accessible parking spaces, lighting and CCTV cameras.
  • The car park also features 59 timed parking spaces for shoppers. Commuter parking is free and available 24 hours, seven days per week.

Cardiff: Station Upgrade

Commenced mid 2011
Completed April 2013

Improvements included:

  • New lifts with three stops linking Council’s Mary Street car park with the station car park and the pedestrian footbridge
  • A re-graded ramp and footpath access from the footbridge to Main Road
  • A new main station building with accessible paths, weather protection enclosures, upgraded ticket office and a wheelchair and family accessible toilet, and extension of the platform to fit eight-car trains on the platform
  • New and upgraded CCTV surveillance and lighting

Caringbah: New Station Canopy

Completed 2014

  • New steel canopies were installed on the station platform to provide better protection for customers against rain and sun exposure.

Clarendon: Station Access Upgrade

Commenced November 2013
Completed April 2014

  • Improvements to accessibility at Clarendon Station included the construction of a new accessible ramp and new stairs, and improved safety through the installation of additional CCTV surveillance cameras and lighting.

Como: New Station Canopy

Commenced June 2014
Completed February 2015

  • New steel canopies were installed on the station platform to provide better protection for customers against rain and sun exposure.

Croydon Station Upgrade

Opened October 2017

Improvements have been made to provide easier access to public transport., including new lifts and stairs, pedestrian footbridge, better shelter, lighting and CCTV cameras.

Dapto: Transport Interchange Upgrade

Commenced August 2013
Completed December 2013

Improvements included:

  • Redesigning and rebuilding the ramp on the eastern side of the station to make it wheelchair accessible
  • New signage and more bus route and timetable information
  • New seating in the taxi and bus zones and a safer bus access road
  • Improving lighting in and around the station, bus interchange and taxi zone, and upgrading footpaths around the station.

Dungog: Station Upgrade

Commenced July 2013
Completed November 2013

  • The improvements to Dungog Station included the construction of a new ramp, new pedestrian walkway and an upgrade of the existing ramp leading to the platform.

Emu Plains: New Commuter Car Park

Commenced March 2010
Completed February 2011

  • The Emu Plains Commuter Car Park was constructed on the northern side of Emu Plains Station with an entry from Lee Street. The car park provides approximately 275 spaces and includes accessible parking spaces, security lighting and CCTV surveillance.

Engadine: New Commuter Car Park, Footpath and Lighting 

Commenced January 2017 
Completed June 2017

Improvements included:

  • A new commuter car park  along the Princes Highway (southbound) and upgrading two accessible parking spaces within the existing car park near the station
  • Stormwater works, footpath works and fencing works
  • New and improved lighting.

Epping: Transport Interchange Upgrade

Completed July 2013

Improvements included:

  • Upgrading the footpath on the western side of Beecroft Road (north of Epping Hotel) and upgrading road, pavement, kerb and guttering
  • Installing a new bench seat at the existing bus stop on the western side of Beecroft Road.

Fairfield: Transport Interchange Upgrade

Commenced February 2013
Completed June 2014

Improvements included:

  • Reconfiguring the bus interchange into the commuter car park previously at the intersection of The Crescent and Court Road
  • Formalising the kiss and ride zone on the westbound lane of The Crescent
  • Relocating the taxi rank to the eastbound lane at the western end of The Crescent
  • Relocating the signalised pedestrian crossing and creating a new zebra pedestrian crossing on The Crescent
  • Improving the streetscape on The Crescent and throughout the bus interchange, including new paving, street furniture, landscaping and wayfinding signage
  • Extending the station forecourt to incorporate the historic crane previously located in the bus interchange
  • Upgrading CCTV camera surveillance.

Flemington Station Upgrade

Opened March 2017

Improvements have been made to provide easier access to public transport, including new lift access, ‘kiss and ride’ zone and footbridge.

Gerringong: Station Upgrade

Commenced late 2012
Completed December 2012

  • The improvements to Gerringong Station included regrading and widening the existing external ramp which provides access to the platform, and provision of a new Disability Discrimination Act (DDA) compliant car parking space.

Glenbrook: Commuter Car Park and Interchange Upgrade

Commenced September 2013
Completed March 2014

Improvements included:

  • New commuter car park providing 56 extra car parking spaces and two accessible parking spaces close to the station entrance
  • A safer pedestrian crossing and traffic island, improved footpaths, wayfinding signage and security fencing
  • Safety improvements to the station entrance including the installation of a new balustrade and non-slip paint to the ramp
  • Improved lighting between the station entrance and the new car park.

Glenfield: New Commuter Car Parks

Multi-storey Commuter Car Park

Commenced October 2009
Completed September 2010

  • The multi-storey commuter car park is located north-east of the station with entry off Roy Watts Road. The car park provides approximately 700 spaces and includes accessible parking, lift access to all levels, CCTV surveillance and security lighting. Parking is free and available 24 hours, seven days a week. This car park was delivered as part of the South West Rail Link.

Seddon Park Commuter Car Park

Commenced May 2009
Completed October 2009

  • The car park at Seddon Park was extended to provide 117 new parking spaces for commuters using Glenfield Station. The commuter car park includes accessible parking and security lighting with the entrance off Salisbury Avenue, Glenfield.

Gordon: New Commuter Car Parks and Interchange

Completed June 2015

  • Over 130 commuter parking spaces were provided at the upgraded Werona Avenue Commuter Car Park in April 2014
  • A new commuter car park and interchange on the western side of Gordon Station, off Henry Street, provides 214 commuter parking spaces (an increase of 135), including five accessible parking spaces. The car park and interchange also includes bicycle racks, motorcycle parking, bus stops, taxi zone, weather protected waiting areas, lighting and CCTV cameras.

Gosford: New Commuter Car Parks

Commenced January 2015
Completed October 2015

  • Two new commuter car parks were constructed on Mann Street, Gosford, to provide 86 additional commuter parking spaces in close proximity to Gosford Station.

Granville: New Commuter Car Parksand Transport Interchange Upgrade

Completed January 2015

  • A new commuter car park on the corner of Rowell and Cowper streets was constructed to provide 20 additional commuter parking spaces in close proximity to Granville Station.
  • As part of this project, the Granville bus interchange was upgraded and a new commuter car park on Mary Street which provided 40 additional commuter parking spaces. New public toilets, lighting, CCTV, footpaths and landscaping were also provided.

Greta: Station Upgrade

Completed March 2013

  • The improvements to Greta Station included redesigning and rebuilding the existing ramps on both sides of the station and the entrances to improve customer access.

Harris Park Station Upgrade

Completed July 2018

  • Improvements include lifts, family accessible toilets, lighting and new CCTV to boost access and security.

Hamilton: Station Upgrade

Completed March 2013

  • The improvement to Hamilton Station included redesigning and rebuilding the existing ramp from the platform to the station entrance, off Beaumont Street.

Heathcote: Station Upgrade

Commenced July 2015
Completed December 2016

Improvements included:

  • A ‘kiss and ride’ zone and new bike facilities
  • New lift, stairs and forecourt at Wilsons Parade
  • Better access for pedestrians – a footbridge, new footpaths and a crossing
  • Improvements to commuter car parks.

Helensburgh: Commuter Car Park

Commenced April 2009
Completed September 2009

  • The commuter car park provides 70 new parking spaces on the southern side of the station and includes security lighting and CCTV surveillance. Additional accessible parking spaces were provided in the existing car park, closer to the station.

Holsworthy: Commuter Car Park Extension and New Commuter Car Park

Car Park Extension 

Commenced June 2015
Completed May 2016

  • Transport for NSW has extended the car park at Holsworthy Station to provide 462 additional commuter spaces and 18 new motorcycle spaces
  • The project included construction of additional parking levels on both of the existing multi-storey car parks, a new lift, extension of an existing lift, and the installation of new lighting and CCTV security cameras to improve commuter safety.

Multi-deck Car Park 

Commenced March 2009
Completed December 2009

  • The new multi-deck car park constructed over the existing car park at Holsworthy provides 350 new parking spaces for commuters in South West Sydney.

Homebush Station Upgrade

Opened March 2018

Improvements include three new lifts, weather protection canopies, bicycle parking facilities, wayfinding signage, family accessible toilet and accessible parking spaces, kiss and ride, new bus shelter, improved lighting and CCTV.

Huntleys Point: Transport Interchange Upgrade

Commenced September 2015
Completed June 2016

Improvements included:

  • A new lift providing access to the wharf and a new accessible pathway from Huntleys Point Road to the new lift
  • Relocation of two accessible parking spaces to provide a direct link to the new pathway and lift
  • Upgrade of the turning circle on Huntleys Point Road and a new accessible drop-off and pick-up area
  • Lighting and CCTV
  • Replacement of existing canopies from the waiting area to the new lift and the installation of new canopies along the stairs adjacent to the new lift.

Ingleburn: Station Upgrade

Completed September 2015

Improvements included:

  • Three new lifts and covered walkways from the lifts to the platforms
  • Reconfigured station entries and new customer amenities
  • Improvements to the bus stop and canopy, taxi zone, lighting, new bicycle storage and accessible parking, and formalised kiss and ride facilities.

Jannali: Station Upgrade

Commenced late 2012
Completed April 2013

  • Improvements to Jannali Station included redesigning and rebuilding the current ramp on the western side of the station and upgrading the footpath on the eastern side of the station.

Station Upgrade and Interchange Works

Commenced 2016
Completed 2017

  • Improvements have been made to provide easier access to public transport
  • Facilities include lifts, stairs, canopies, a new family accessible toilet, bike racks, improved lighting and CCTV.

Katoomba: New Commuter Car Park

Commenced November 2009
Completed July 2010

  • Constructed north east of the station at the corner of the Great Western Highway and Goldsmith Place, the car park provides 85 new parking spaces, security lighting and CCTV surveillance. In addition, three new accessible parking spaces have been provided on the southern side of the station.

Kiama: New Commuter Car Park

Commenced September 2013
Completed December 2013

  • The Kiama commuter car park was constructed on Bong Bong Road, behind Kiama Mowers, approximately 100 metres from Kiama Station. The car park provides 40 spaces including an accessible parking space, security lighting and CCTV surveillance. Parking is free and available 24 hours, seven days per week.

Killara: New Commuter Car Park

Completed May 2015

  • More than 80 new commuter car parking spaces, accessible parking spaces, and a new accessible pedestrian ramp 
  • Improved lighting
  • Line marking, bollards and wheel stops, and minor landscaping improvements including a widened driveway entry.

Kingswood: Transport Interchange Upgrade and NewCommuter Car Park

Transport Interchange Upgrade 

Commenced August 2011
Completed November 2011

Improvements included:

  • New passenger drop off and pick up points, including 'kiss and ride' and taxi zones, and sheltered bicycle facilitieson the northern side
  • Sheltered bicycle facilities, a shelter for taxi and 'kiss and ride' users on the northern side of the station and upgraded bus stops with tactiles and signage on Park Avenue for improved accessibility. In addition, the upgrade included a new footpath on the northern side of the station; a new pedestrian median safety fence on the Great Western Highway and new signage on the southern side of the station.

Commuter Car Park

Completed April 2012

Improvements included:

  • Approximately 23 additional spaces, a new entrance, improved traffic flow, CCTV surveillance, lighting and a covered footpath to the station
  • A new 'kiss and ride' and taxi zone was also constructed on the southern side to make passenger drop off in the new car park  easier
  • Lighting was added in the existing commuter car park on the northern side to improve safety
  • Parking is free and available 24 hours, seven days per week.

Kogarah: Transport Interchange Upgrade

Commenced June 2011
Completed April 2012

  • The station forecourt was redesigned and facilities upgraded on surrounding roads, including changes to bus stops, 'kiss and ride' facilities, taxi zones, a pedestrian crossing and bicycle facilities.

Leura Station Upgrade

Completed February 2018

Improvements have been made to provide easier access to public transport.

Facilities include a new lift, staircase replacement, upgraded toilet facilities, a ‘kiss and ride’ zone, formalised taxi rank, improved lighting and CCTV.

Lithgow: New Station Canopy

Completed 2014

  • New steel canopies were installed on the station platform to provide better protection for customers against rain and sun exposure.

Loftus: New Station Canopy

Completed 2014

  • New steel canopies were installed on the station platform to provide better protection for customers against rain and sun exposure.

Macarthur: NewCommuter Car Park and Pedestrian Crossing

Commuter Car Park

Completed November 2011

  • The upgraded commuter car park provides an additional 290 commuter parking spaces on the western side of the Tailby Street car park and a further 160 spaces on the eastern side of the Tailby Street car park. Parking is free and available 24 hours, seven days per week.

Pedestrian Crossing

Commenced October 2013
Completed December 2013

  • A signalised crossing on Menangle Road was constructed between Tailby Street and Geary Street to improve the connectivity between the commuter car park and the station.

Marayong: NewCommuter Car Park, Footpaths and Lighting

Commenced November 2015
Completed June 2017

  • More than 100 new spaces along Railway Road and Harvey Road. 

Marrickville: Station Upgrade

Commenced June 2016
Completed May 2017

Improvements included:

  • Two new lifts, a new staircase and a new concourse.
  • Kiss and ride facilities, bicycle parking, accessible parking and a new taxi rank.
  • A new family accessible toilet.

Martin Place: Station Upgrade

Completed April 2011

  • The Martin Place Easy Access Upgrade included a lift from Martin Place street level to the station concourse.

Marulan: Station Upgrade

Commenced December 2013
Completed April 2014

Improvements included:

  • An accessible ramp and footpath from Platform 1 to the existing pedestrian level crossing
  • An accessible ramp and footpath leading to Platform 2
  • New balustrade and hand rails, improved safety including tactile surfacing, lighting and CCTV surveillance cameras.

Milsons Point: Wharf Interchange Upgrade

Commenced February 2013
Completed April 2013

  • Improvements included a 'kiss and ride' upgrade, footpath regrading and a new bus shelter.

Miranda: New Station Canopy

Completed 2014

  • New steel canopies were installed on the station platform to provide better protection for customers against rain and sun exposure.

Mittagong: Station Upgrade

Commenced February 2014
Completed October 2014

Improvements included:

  • A new accessible ramp to Platform 1, new footpath and kerb ramp, formalised ‘kiss and ride’ and bus stop zones
  • Improvements to the existing accessible parking space
  • New balustrade, fencing and hand rail to match existing building architecture
  • A new bike rack for eight bikes, improved safety features including tactile surfacing, lighting and CCTV surveillance cameras.

Moss Vale: New Commuter Car Park

Commenced June 2013
Completed December 2013

The car park provides:

  • 56 spaces and includes security lighting and CCTV surveillance
  • Two additional accessible parking spaces were also provided near the station entrance as part of this project
  • Upgraded bicycle racks, improved lighting on Dalys Way and a new pedestrian crossing to the car park on Dalys Way.

Mount Druitt: New Commuter Car Park

Commenced May 2009
Completed October 2012

  • The multi storey commuter car park is located north-east of Mount Druitt Station on the corner of North Parade and Mount Street, providing commuters with approximately 220 additional car park spaces.

Mulgrave: Station Upgrade

Commenced April 2014
Completed April 2014

  • Improvements to accessibility at Mulgrave Station included the construction of a new accessible ramp, and improved safety through the installation of additional CCTV surveillance cameras and lighting.

Museum: Station Upgrade

Commenced May 2015
Completed November 2016

Improvements included:

  • A new lift connecting the entry of the station on the corner of Elizabeth and Liverpool streets and the underground station concourse.
  • Two new lifts connecting the station concourse with the platforms.
  • An accessible ramp at the station entrance.
  • A new family accessible toilet.
  • Refurbishment of the toilets within the concourse.

Narwee: Transport Interchange Upgrade

Commenced March 2011
Completed September 2011

  • The project delivered upgrades to bus stops, a 'kiss and ride' zone and taxi zone with shelters on Penshurst Road South, new bicycle facilities and improvements to footpaths through the subway and on both sides of the station.

Narwee Station Upgrade

Completed December 2017

Improvements have been made to provide easier access to public transport.

Facilities now include a family accessible toilet, lift access, improved customer information and wayfinding, stairs and upgrades to lighting and CCTV.

Newtown: Station Upgrade

Commenced February 2011
Completed February 2013

Improvements included:

  • A centrally located concourse, new covered walkways
  • Anew lift, upgraded toilet and retail premises
  • New platform canopies and improved CCTV, lighting, signage, tactile tiles and bike racks.

Normanhurst: Transport Interchange Upgrade

Commenced March 2013
Completed June 2013

Improvements included:

  • Upgraded road pavement and kerb and gutter at bus stops on Denman Parade, and upgraded footpaths
  • New bike racks
  • New blisters at the existing pedestrian crossing on Denman Parade to improve pedestrian safety.

North Strathfield: Transport Interchange Upgrade

Commenced August 2011
Completed late 2012

Improvements included:

  • A new shelter over a pedestrian walkway
  • New and formalised 'kiss and ride' zones, bicycle racks
  • A new pedestrian access ramp, upgrade of bicycle facilities and upgrade of footpaths.

Oak Flats: New Commuter Car Park

Commenced November 2013
Completed June 2014

  • The Oak Flats commuter car park project involved the construction of an additional 230 parking spaces, new lighting, landscaping and fencing.

Oatley: Station Upgrade, New Footbridge and New Commuter Car Park

Commenced January 2015
Completed May 2017

Improvements included:

  • New lift and stair access to Oatley Parade, Mulga Road and the station platforms and new station forecourts on both Oatley Parade and Mulga Road with landscaping to suit the current features
  • A new pedestrian footbridge providing access from the new Oatley Parade and Mulga Road forecourts
  • Installation of  an accessible toilet on the station platform
  • Interchange upgrades including; reconfiguration of kiss and ride, accessible parking, taxi and bus stops locations, additional cycle storage, lighting, CCTV surveillance cameras and new wayfinding signage
  • A new commuter car park with 100 spaces.

Ourimbah: Accessibility Upgrade

Commenced June 2013
Completed September 2013

Improvements included:

  • Two small ramps at the station building doorways on Platform 2
  • New handrails and tactile indicators.

Padstow: New Commuter Car Park

Commenced July 2014
Completed May 2015

  • 100 additional commuter parking spaces, lift and stair access, motorcycle parking spaces, bicycle racks, lighting and CCTV cameras
  • Short-term parking and family accessible toilets have also been provided at the car park site and are managed by Bankstown City Council.

Panania: Transport Interchange Upgrade

Completed October 2011

Improvements included:

  • Upgrades to bus stops and footpaths, 'kiss and ride' pedestrian drop off zones, and a taxi zone on the north side of the station, 
  • Bicycle racks, shelters, fencing, guides for the visually impaired and signage to improve accessibility.

Panania Station Upgrade

Completed

Improvements are underway to provide easier access to public transport.

Facilities being constructed include lifts, ramps, bicycle facilities, a new family accessible toilet, improved customer information and wayfinding, new stairs to the platforms and upgrades to lighting and CCTV.

Pendle Hill Station Upgrade

Opened July 2017

Improvements include four new lifts and a family accessible toilet, a new station concourse, footbridge, new stairs and platform canopies, as well as a commuter car park with around 125 additional spaces.

Pennant Hills: Transport Interchange Upgrade

Commenced April 2013
Completed July 2013

Improvements included:

  • Upgrading uneven footpath areas at Railway Street, Yarrara Road and Ramsay Road
  • Reconstructing uneven road pavement in Railway Street and at the intersection of Ramsay Road and Pennicook Lane
  • Converting the existing RailCorp staff car park for commuter use, including an upgrade to comply with accessibility standards. Five car spaces have been made available for customers, including two accessible parking spaces
  • New signage for 'kiss and ride' areas on Yarrara Road and Ramsay Road.

Penrith Commuter Car Park

Completed August 2017

Improvements have been made to parking at Penrith Station to include around 430 additional commuter parking spaces.

Facilities will include parking, a lift, stairs, lighting and CCTV upgrades.

Penrith Station Upgrade

Opened November 2017

Improvements have been made to provide a better customer experience and increase capacity for future growth in the region.

Facilities include new stairs and canopies, a new station concourse, new accessible amenities and an improved interchange area.

Picton: Transport Interchange Upgrade

Commenced September 2013
Completed December 2013

Improvements included:

  • Upgrading the footpath pavement on the northern side of Station Street
  • A new refuge island on Station Street and a new pedestrian footpath for the southern side of Station Street
  • A pedestrian safety fence along the northern side of the Prince Street road bridge (over the railway line) and new way-finding signage.

Redfern: Access Upgrade

Commenced April 2015
Completed November 2015

Improvements included:

  • A new lift to platforms 6 and 7
  • A new section of canopy providing sheltered access to the lift
  • New CCTV, lighting and fencing around the lift area.

Revesby: New Commuter Car Park

Commenced March 2010
Completed April 2011

  • 720 spaces, with approximately 580 spaces allocated for commuters and the remainder for shoppers
  • 15 accessible parking spaces, lift access to all levels, accessible pathways, security lighting and CCTV surveillance
  • Parking is free and available 24 hours, seven days per week.

Riverstone: Station Upgrade

Commenced November 2013
Completed April 2014

  • Improvements to accessibility at Riverstone Station included re-grading the internal ramp near the ticket office and construction of a new ramp between the platform and Garfield Road.

Rockdale: Commuter Car Park Extension

Commenced November 2013
Completed September 2014

Improvements included:

  • An additional 24 parking spaces
  • Three new accessible parking spaces and two existing accessible parking spaces upgraded as part of this work
  • Parking is free and available 24 hours, seven days per week.

Scone: Station Upgrade

Commenced March 2013
Completed May 2013

Improvements  included:

  • Resurfacing and re-leveling the footpath
  • Line-marking the accessible car parking space.

Shell Harbour Junction: Station and Interchange Upgrade 

Completed November 2014

  • The station and interchange is located at the end of Piper Drive, off Dunmore Road.

Singleton: Station Upgrade

Commenced late 2012
Completed February 2013

  • Improvements to Singleton Station included improved ramp access.

Springwood: New Station Canopy

Completed May 2015

  • New steel canopies were installed on the station platform to provide better protection for customers against rain and sun exposure.

St James: Station Upgrade

Completed April 2011

  • Improvements to access at St James Station included a lift from street level to concourse level tunnel.

Strathfield: Station Upgrade

Commenced October 2013
Completed January 2014

Improvements included:

  • Removal of retail kiosks
  • Relocation of Public Information Displays (PIDs)
  • A handrail around the central columns
  • Lighting and new tiling where the kiosks were removed.

Sutherland: Transport Interchange Upgrade, Access Upgrade, New Commuter Car Park

Transport Interchange Upgrade

Commenced late 2012
Completed May 2014

  • The Sutherland Interchange Upgrade provides increased bus capacity, alleviates some existing traffic congestion and provides a safer environment for pedestrians around Sutherland Station.

Access Upgrade 

Commenced April 2014
Completed October 2014 

  • A new lift linking the concourse and Platform 1, new stairs and canopies, an extension to the station concourse and a new ticket office were opened in October 2014.

Commuter Car Park

Commenced August 2014
Completed July 2015

  • 388 commuter parking spaces, lift and stair access, and accessible parking spaces
  • Lighting and CCTV cameras
  • The ground floor of the car park also features 84 spaces for use of members of Club on East (formerly Sutherland United Services Club)
  • Parking in the upper 4 levels is free and available 24 hours, seven days per week.

Sydenham: Station Upgrade

Commenced January 2011
Completed February 2013

Improvements included:

  • A new elevated concourse and station entrance with new ticketing facilities, retail space, a staff office and public and family accessible toilets
  • Four new lifts to the platform and concourse
  • Expansion of the station forecourt area to include new bicycle storage facilities and new staircases to access platforms.

Tahmoor: Station Upgrade

Commenced May 2015
Completed October 2015

  • Work was undertaken to provide easier access to public transport, including construction of new accessible ramps to both platforms, construction of new accessible parking spaces and improved safety features including lighting and CCTV surveillance cameras.

Thirroul: New Commuter Car Park 

Commenced May 2015
Completed September 2015

  • A new commuter car park was constructed on Church Street to provide 151 commuter parking spaces near Thirroul Station. The car park also features security lighting and CCTV surveillance cameras.

Unanderra: Station Upgrade

Completed March 2013

Improvements included:

  • Remediation of the existing station platform
  • Reinstating CCTV, lighting, draining and maintenance to the existing pedestrian footbridge.

Victoria Street Station Upgrade

Improvements are now complete to provide easier access to public transport.

Facilities include new lifts and canopies, a family accessible toilet, installation of accessible parking and taxi bays on both sides of the station, footpath improvements, lighting and CCTV.

Wallarobba: Station Upgrade

Commenced December 2013
Completed April 2014

Improvements included:

  • A new accessible ramp
  • An accessible parking space with footpath leading to the ramp
  • Upgraded safety features including lighting and CCTV surveillance cameras.

Waterfall: Station Upgrade

Commenced March 2014
Completed July 2015

Improvements included:

  • A new concourse with level access to the Kooraban Street overbridge
  • A new lift from the concourse to the station platform, raised station platform level, and weather protection canopies on the station platform
  • Resurfaced Kooraban Street overbridge footpath, accessible toilets on the station platform level
  • New 'kiss and ride' facility and upgraded bicycle storage facilities.

Windsor: Station Upgrade

Commenced October 2011
Completed 2012

Improvements included:

  • A new station building, reconfiguration and refurbishment of the existing station building, and reconstruction of the platform,
  • Replacement of awnings, upgrade of the public address, CCTV and lighting systems.

Wentworth Falls Station Upgrade

Opened June 2017

Completed December 2017

Improvements are being made to provide easier access to public transport, including three new lifts, weather protection canopies, improved accessible toilets and new ‘kiss and ride’ area.

Wentworthville Station Upgrade

Improvements have been made to provide easier access to public transport.

Facilities include three new lifts, weather protection canopies, improved accessible toilets and waiting areas, new bicycle storage facilities, new kiss and ride.

Woy Woy: New Commuter Car Park

Commenced April 2010
Completed April 2011

  • Three levels of parking with approximately 300 additional spaces, including 17 accessible spaces, lighting, and CCTV surveillance cameras.

Yass Junction: Station Upgrade

Commenced May 2015
Completed October 2015

Improvements included:

  • A new accessible ramp to platform 2 and the ticket office
  • New accessible parking spaces and improved safety features including lighting.